LANTNAVFACENGCOM A&E GUIDE
4/17/93
(c) Exterior Color Board - Provide actual samples of all exterior
materials and colors.
(d) Photographs - Provide sufficient color slides or color prints
necessary to indicate the character of the existing facilities on the base judged by the
A&E to have influence on the architectural design of his project. The three (3) nearest
permanent buildings must be included.
(4) See Value Engineering Section 2.11 for VE Submittal Requirements.
3.3.2
35% STATION PRESENTATION
A. PURPOSE: After the PEP has been prepared, there may be a delay of
several months until the project is approved for final design and options for final
design exercised. The presentation proposed by this item allows the Activity a chance
to reverify that the A&E is proceeding from the project concept and scope phase to a
design stage that still meets their functional and organizational requirements. It is not
intended to be a thorough technical presentation, but functional reconfirmation There
will be no break in the design process as the A&E proceeds to the next submittal stage.
B. ELEMENTS:
(1) Drawings
Civil
Site Plan
Utility Plan
Architectural
Floor Plans
Furniture Footprint Plan.
Finish Schedule
Roof Plan
Elevations
Typical Walls Sections
Mechanical
Schema tic Diagrams
Mechanical Room Plans - Major Equipment
3-5