Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


LANTNAVFACENGCOM A&E GUIDE
4/17/93
SAMPLE OUTLINE SPECIFICATION
Division 1 - General Requirements
General Paragraphs
Section 01010
Additional General Paragraphs
01011
Submittals
01300
Quality Control
01400
Environmental Protection
01560
Operation and Maintenance Data
01730
Division 2 - Site Work
Section 02050
Demolition and Removal:
Remove existing partitions, doors, plumbing fixtures and lighting
fixtures as indicated.
02220
General Excavation, Filling, and Back Filling:
Excavating, back filling, and compacting for buildings and utilities.
Grading for grass areas.
02284
Soil Treatment for Subterranean Termite Control:
Treatment for building.
02661
Exterior Water Distribution System:
Buried water piping service to building 5-foot line.
02695
Exterior Above Ground Steam Distribution System:
Above ground piping, buried preinsulated piping, and manholes.
02697
Exterior Buried Pumped Condensate Return System:
Buried preinsulated piping and manholes.
02730
Exterior Sanitary Sewer System:
Sanitary gravity sewer service to buildings 5-foot line.
02930
Turf:
Seeding fertilizing all newly graded finish earth surfaces and other
areas disturbed by site operations.
6-9








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business