duration of the contract, shall be identified t o the PM at least two weeks prior to the
individual's scheduled visit.
2.13 CAMERA PASS
Some A/E's may find it advantageous to photograph the existing conditions at project
sites for future reference to assist in their design efforts. This is usually p ermitted, but
only with proper clearance. All requests to photograph facilities at Cherry Point must be
made in writing to the PM at least two weeks prior to the anticipated visit.