(3) Color Design (if applicable):
(a) Finish schedule with color code columns completed with the appropriate
color codes.
(b) Where other than usual painting or wall covering schemes or ceramic wall
tile, graphics, built -in equipment or window treatments are used, labeled floor plans,
elevations and sketches using the color codes as necessary should be drawn.
(c) A color legend alon g with color notes should be completed referencing and
specifying all finishes used in the finish schedule.
(d) A color board identifying all finish colors listed in the finish schedule,
labeled with appropriate color codes. The board should be a reas onable, transferable size
(maximum size 20" X 30").
(e) Check with activity to ensure that collateral equipment list is accurate. If
necessary, revise the collateral equipment list and furniture footprint.
(4) Specification - photographic copies of fully edited guide specifications
supplemented as required are acceptable. Specifications must be thoroughly edited for
coordination with the drawings. See Section 6.
(5) Cost Estimate - See Section 7.
(a) Computerized Estimate (MEANS, MCASES, et c):
1. Computer run estimate
2. Marked 35% estimate
3. Vendor/manufacturer quotes
(b) Manual Estimates:
1. Backup estimate with summary sheets
2. Marked 35% estimate
3. Vendor/manufacturer quotes
(c) Bid Items - if estimated construction cost exceeds construction funds
available, identify in conjunction with the activity additive bid items and respective
values with detailed back -up estimates required to produce a base bid within available
construction fund s. See Section 6.13 for additional information.