Document 00102 "List of Drawings" has been edited in SPECSINTACT format
and is included with this submittal?  [_] Yes  [_] No (If no, provide
reason)
4.
INFORMATION FOR DOCUMENT 00200
FAR 52.236-4, Physical Data (APR 1984)
If physical data (e.g., test borings, hydrographic, weather conditions
data) to be furnished or made available, complete the following as
appropriate.
(1) The indications of physical conditions on the drawings and in the
specifications are the result of site investigations by
_____________________________________________________________
_____________________________________________________________
_____________________________________(insert a description of
investigative methods used, such as surveys, auger borings, core
borings, test pits, probings, test tunnels).
(2) Weather conditions: _________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________(insert a summary of weather
records and warnings).
(3) Transportation facilities: __________________________________
_____________________________________________________________
_________________________________________(insert a summary of
transportation facilities providing access from the site,
including information about their availability and limitations).
(4) _____________________________________________________________
_______________________(insert other pertinent information).
5.
INFORMATION FOR DOCUMENT 00451
FAR 52.223-4, Recovered Material Certification (OCT 1997)
Contract uses "Recovered Material."  (i.e. Materials that have been
collected or recovered from solid waste per FAR 23.402).
[_] Yes  [_] No
Item referred to in Section _______.  Percent of recovered material
_______.  EPA and agency designated item?  [_] Yes  [_] No
6.
INFORMATION FOR DOCUMENT 00710
a.
DFARS 252.203-7002 Display of DOD Hotline Poster (DEC 1991).
Contract
is greater than $5 million.  [_] Yes  [_] No
b.
FAR 52.204-2, Security Requirements (AUG 1996) - Alternate II (APR
1984)
Under the performance of this contract, will contractor employees be
required to have I.D.'s for access to the jobsite?  [_] Yes  [_] No
2