Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


Cover Sheet/Check List for
TEAM 1391 (+) and PCEs
Program Year
Project No: P-526
Title: BEQ Modernization 1300 Series
FY00 PCE
Location:  NAVAL STATION, Pearl Harbor, Hawaii
A. Major Project Elements Confirmed:
C. Attachments:
1.Budget Estimate Summary Sheet
2. Economic Analysis
3. Site Plan
4. Facility Planning Document(s)/P-80 Calculations
(1391 Block)
5. R-19 (Bachelor Housing Survey)/Determination of
1. Budget cost certification (9)
Hawaii as High Cost Region)
2. Planning Consistent with Master Plan and or
6. Notice of Violation (NOV)
Base/Regional Development (10)
7. Other:
3. Scope - based on FPDs and P-80 Calculations
D. Team Meeting Date(s): 5/29/97 and 10/20/97
4. Operational Requirement documented (11)
On-site
Conference call
VTC
5. Current situation (11)
E. Project Team Members:
6. Impact if not provided (11)
Activity:
NAVSTA PEARL (Billeting Officer): LT. Hobbs
7. Best Alternative supported by Economic
PWC Pearl (Planners): S. Johnston, W. Yamamoto
Analysis (11)
EFD/EFA: PACNAVFACENGCOM: R. Kikkawa, and G. Ota
8. Siting-incl. AICUZ, airfield safety
Major Claimant : COMNAVREG Hawaii R464 LT (Regional
clearances, EMR, wetlands, explosive
Commander Representative): L. Tanaka and
safety certification, fire protection certification (12)
J. Takeuchi
9. Soils, foundation, & seismic
NAVFAC: N/A
considerations (12)
Other Commands:
10. Systems safety (12)
F. Meets Military Requirements:
11. Utility & other infrastructure support (12)
12. Operating/constr'n permits identified (12)
C.O. Naval Station
Signature/Date
13. Special approvals-include Historical Preservation
Project Cost Review:
Section 106 (12)
14. Feasibility/Constructability (12)
15. Environmental (air/water quality,
EFD/EFA Cost Engineer
Signature/Date
hazardous materials, etc.) issues addressed (12)
EFD/EFA Endorsement:
16. NEPA documentation and mitigation issues identified
(12)
17. Equipment from other appropriations (12)
Signature/Date
B. Remarks:
Regional Commander Validation:
13. Ongoing site investigation with SHPO, PACDIV, and
COMNAVBASE.
COMNAVREG Hawaii Representative
Signature/Date
16. Record of Categorical Exclusion is proceeding pending
SHPO's concurrence of "no-effect."
Major Claimant Validation:
CINCPACFLT Representative
Signature/Date








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business