I. PACNAVFACENGCOM DESIGN REVIEW CHECKLIST
Project Title:__________________________________________________________________
______________________________________________________________________________
Reviewer's
60%  _________________________________
Date: __________________
Signature:
100% _________________________________
Date: __________________
Review Item
Yes * No
N/A
General
15. Latest environmental regulations are referenced, especially for
asbestos and lead removal.
16. Limits of asbestos/lead paint removal identified on drawings. Amounts
of asbestos removal identified in Section 02220, "Site Demolition".
17. All permits applied for/addressed (trenching, disposal large scale
grading/storm drain water run-off, clean air, dredging, PWC sewer
connection, etc.)
18. All permits required and their approval process time has been addressed.
19. Maintenance review checklist reviewed and incorporated.
20. Blind vending facilities coordinated with user.
21. Requirements of handicapped (ADA/UFAS) complied with including
completion of 04 signature form.
22. Wall locker requirements coordinated with user and specifications.
23. Government property is completely and accurately specified and/or
identified.
*Note: Provide explanation for "No" responses.