P-141, Change 3
April 1997
26. SECNAV: Secretary of the Navy.
copies
to
the
Commanding
Officer,
SOUTHNAVFAC-ENGCOM,  attention  the
27. SOUTHERN
DIVISION,
NAVAL
appropriate PM.
FACILITIES ENGINEERING COMMAND
24. REVIEW CONFERENCE:  A meeting
(SOUTHNAVFACENGCOM):
Represents
to resolve comments generated by a traditional
the Naval Facilities Engineering Command in
or in-progress review or to conduct an on-board
twenty-six states of the United States and certain
or over-the-shoulder review.
areas outside the continental United States.
25. REVIEW STRATEGY:  A plan for a
28. STATEMENT OF WORK (SOW):
project covering the number, type, and timing of
Indicates the work to be accomplished by the
all Government reviews of A/E prepared work,
A/E and along with the A/E Guide and
including
related
review
conferences,
applicable technical guidance becomes part of
summarized in the Schedule of the SOW, and
the A/E contract.
including some combination of the following:
29. SUPERVISION,  INSPECTION  AND
a. Traditional review - A/E submits design
OVERHEAD (SIOH): A fee charged against
documents  and  stops  work  while  the
the  project  to  cover  the  expenses  of
Government reviews.
SOUTHNAVFACENGCOM
during
construction of the project.
b.In-progress review - Same as traditional
30. TECHNICAL GUIDANCE: Discipline -
review except the A/E continues design effort
while the Government reviews.
specific guidance for AE firms providing services
to SOUTHNAVFACENGCOM.
Technical
c. On-board review - Government reviewers
guidance is contained in separate documents for
and the A/E visit the activity to review the
each of eight disciplines (civil, architecture,
design  documents  submitted  by  A/E;
structural, mechanical, electrical, fire protection,
designated on board/in progress, or on
cost, and specifications) designated as "SODIV-
board/traditional depending on whether or not
TG-100__". The technical guidance documents
the A/E continues or stops work while the
applicable to a specific project become part of
Government reviews.
the A/E contract for that project, along with the
SOW and the A/E Guide.
d.Over-the-shoulder review - Government
reviewers visit the A/E's office to review the
A/E's work in progress.
DEFINITIONS AND ABBREVIATIONS
3-4








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business