Quantcast Table 4-2-5A Solid Waste Landfill Design Checklist -Cont. - mo2130092

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


TABLE 4-2-6A
(cont'd)
Step
Task
3
Design filling area:
a. Select landfilling method based on:
(1)
Site
topography and slopes
(2)
Site
soils
(3)
Site
bedrock
(4)
Site
b. Specify design dimensions:
(1)
Trench width, depth, length
(2)
Cell size
(3)
Cell configuration
(4)
Trench spacing
(5)
Fill depth
(6)
Interim cover soil thickness
(7)
Final cover soil thickness.
c. Specify operational features:
(1)
Use of cover soil
(2)
Method of cover application
(3)
Need for imported soil
(4)
Equipment requirements
(5)
(6)
Asbestos burial area
(7)
Special waste disposal.
4
Design facilities:
a.
Leachate controls
b.
Gas controls
c.
Surface water controls
d.
Access roads
e.
Special working areas
f.
Structures
g.
Utilities
h.
Fencing
i.
Lighting
j.
Washracks
k.
Monitoring wells
1.
Landscaping
m.
Debris control
n.
Methane collection and controls
o.
Liner and leak detection system
p.
q.
Scales.
4-46





 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +