CONTROL INSPECTION TIME TABLES
(EXAMPLE)
Times are for inspection only. After inspection times are selected, add the following
labor hours per facility.
Electrical
Mechanical
Structural/Roofing
1.9 hrs/est
1.9 hrs/est
1.9 hrs/est
Cost Estimate
Travel (based on travel zone in which the facility is located)
It must be noted, the Inspection times determined are average times and may
differ due to differences in the way facilities are arranged and the variety of uses within
each facility.
In determining the total square feet of a facility, look at all category codes for that
facility and add them together. Use the dominant category code when determining the
inspection time. Additional time should be added if security clearances or escorts are re-
quired.
How much time will be required to accomplish a complete inspection
Example:
with cost estimates in Category 61XXX? The facility is a single story
facility located in Travel Zone 5 and the sum of all Cat. Code Sq.
footage is 25000 SF. Facility has built-up roof. No abnormal
conditions or facility layout problem exist.
Inspection Package Time
Structural Electrical Mechanical Roofing
3.0
21.70
22.70
From tables
12.20
1.
1.9
1.90
1.90
2.
Cost Estimate Prep.
1.90
3.
Travel
1
3
3
a. Trips*
2
.55
.55
.55
b. Time/Trip
.55
.55
1.65
1.65
1.10
c. Travel Time
5.45
25.25
26.25
4.
Total (1 + 2 + 3c)
15.20
or 72.15 Hours
*Inspection time divided by 8 hrs/day.
Appendix C-10