Custom Search
 
  
 


Concurrent Technologies Corporation
Remediation Survey
Ground Water Pump and Treat with an Air Stripper
Page 7
2.
Why was the Technology Successful?
Successful at contaning migration of contaminants.
Effectively and consistently reduced VOC levels below discharge criteria.
The success of the system makes it a candidate for future remediation efforts.
3.
Why was the Technology Unsuccessful?
System must be expanded to capture other known contamination areas.
Corrosion in hot vapor train due to condensation of acid gas . Changing the construction
materials from carbon steel to nickel alloys improved laminar flow and eliminated stagnant
regions.
Acetone's insolubility in water.
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
2.
Cost:
B.
Construction of System
1.
Contract Type:
2.
Cost:
C.
Operation of System
1.
Contract Type:
2.
Cost:
$1,240,000








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business