Concurrent Technologies Corporation
Remediation Survey
Ground Water Pump and Treat with an Air Stripper
Page 14
2.
Why was the Technology Successful?
3.
Why was the Technology Unsuccessful?
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
2.
Cost:
B.
Construction of System
1.
Contract Type:
2.
Cost:
C.
Operation of System
1.
Contract Type:
2.
Cost: