- Evaluation and Selection Analysis of Security Glazing for Protection Against Ballistic,Bomb, and Forced Tactics
- Abstract
- Abstract -Cont.
- Foreword
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Section 1: Introduction
- Ballistic Resistant Glazing
- Security Glazing Planning and Analysis Worksheets
- Required Information
- Organization of Procedures
- Related Instructions
- Figure 1. Planning Procedures Organization
- Figure 2. Analysis Procedures Organization
- Figure 3. Safevue Procedures Organization
- OPNAVINST 5510.1H.
- Section 2: Glazing System Overview
- Monolithic Cross-Sections
- Thermally Tempered Glass
- Chemically Treated Glass
- Wire-Reinforced Glass
- Acrylic
- Laminated Cross-Sections
- Fragment Retention Film
- Thermally Tempered Glass (TTG)
- Laminated and Fused Polycarbonate
- Glass-Clad Ionomer
- Insulated/Air Gap Cross-Sections
- Glazing Tape, Sealant and Setting Blocks
- Ballistic Resistance
- Anchor Bolt Types
- Embedded Anchor
- Unreinforced Brick
- Table 1. Wall Construction
- Section 3: Aggressor Threats and Tactics
- Categories Not Addressed
- Tools, Weapons, and Explosives
- Section 4: System Analysis
- System Evaluation Procedure
- Figure 6. Process Chart and Description: System Selection Procedure
- Figure 7. Process Chart and Description: System Evaluation Procedure
- Selection Attack Analyses Procedure
- Figure 8 .Process Chart and Description: Selection Attack Analyses Procedure
- Figure 9. Process Chart and Description: Evaluation Attack Analyses Procedure
- Required Information
- Figure 10. Process Chart: Selection Reconciliation Procedure
- Evaluation Reconciliation Procedure
- Requirements Revision Procedure
- Figure 12. Process Chart: Evaluation Reconciliation Procedure
- Figure 13. Procedure Description: Evaluation Reconciliation Procedure
- Figure 14. Process Chart: Requirements Revision Procedure
- Figure 15. Procedure Description: Requirements Revision Procedure
- Section 5: Ballistic Resistant Glazing
- Figure 16. Process Chart: Ballistic Resistant Glazing Evaluation Procedure
- Table 5. Ballistic Tactic Threat Severity Level Standards
- Required Information
- Figure 18. Process Chart: Cross-Section Ballistic Resistant Thicknesses Procedure
- Figure 19. Description: Cross-Section Ballistic Resistant Thicknesses Procedure
- Required Information
- Ballistic Resistant Glazing Selection Procedure
- Figure 20. Process Chart: Ballistic Resistant Glazing Selection Procedure
- Required Information
- Section 6: Blast Resistant Glazing
- Frame Loads
- Blast Resistant Glazing Evaluation Procedure
- Figure 22. Process Chart: Blast Resistant Glazing Evaluation Procedure
- Required Information
- Blast Resistant Glazing Selection Procedure
- Figure 24. Process Chart: Blast Resistant Glazing Selection Procedure
- Figure 25. Description: Blast Resistant Glazing Selection Procedure
- Section 7: Forced Entry Resistant Glazing
- Required Information
- Figure 26. Process Chart: Forced Entry Resistant Glazing Selection Procedure
- Figure 27. Description: Forced Entry Resistant Glazing Selection Procedure
- Table 17. Lag Bolt Maximum Spacing for Low Threat Severity Level
- Table 22. Minimum Frame Specification for Medium Threat Severity Level
- Forced Entry Resistant Glazing Evaluation Procedure
- Required Information
- Figure 28. Process Chart: Forced Entry Resistant Glazing Evaluation Procedure
- Figure 29. Description: Forced Entry Resistant Glazing Evaluation Procedure
- Section 8: Environmental Analysis
- Polycarbonate Environmental Analysis Procedure
- Laminated Glass Environmental Analysis Procedure
- Required Information
- Section 9: Cost Analysis
- Figure 34. Process Chart and Description: Cost Estimate Procedure
- Cross-Section Material Cost Estimate Procedure
- Figure 36. Process Chart and Description: Cross-Section Material Cost Estimate Procedure
- Table 29. Glass Cost Factors and Weight per Unit Area (English Units)
- Cross-Section Fabrication Cost Estimate Procedure
- Figure 37. Process Chart: Cross-Section Fabrication Cost Estimate Procedure
- Required Information
- Figure 39. Process Chart and Description: Frame Cost Estimate Procedure
- Installation Cost Estimate Procedure
- Initial Cost Estimate Procedure
- Figure 40. Process Chart and Description: Installation Cost Estimate Procedure
- Figure 41. Process Chart and Description: Initial Cost Estimate Procedure
- Appendix A Process Charts
- Simple Sequence Structure
- Procedural Structure
- Iteration Structure
- Figure A-7. Do While Structure
- Figure A-8. For Structure
- Appendix B- Security Glazing Planning and Analysis Worksheets
- Glazing System Design Criteria Summary Worksheet
- Asset Value /Aggressor Likelihood Worksheet
- Glazing System Tactic and Threat Severity Level Worksheet
- Collateral Damage Assessment Worksheet
- Cross-Section Evaluation Worksheet
- Frame Evaluation Worksheet
- Anchorage Evaluation Worksheet
- Wall Evaluation Worksheet
- Cross-Section Selection Worksheet
- Frame Selection Worksheet
- Anchorage Selection Worksheet
- Wall Selection Worksheet
- Cross-Section Cost Factor Worksheet
- Frame Cost Factor Worksheet
- Installation Cost Worksheet
- Initial Cost Worksheet
- Safevue Data Entry Worksheet
- Safevue Analysis Worksheet
- Appendix C Safevue Procedures
- Figure C-1. Process Chart and Description: Safevue Evaluation Analysis Procedure
- Glazing Data Preparation for Evaluation Analysis
- Figure C-2. Process Chart and Description: Data Preparation for Evaluation Analysis Procedure
- Required Information
- Explosives Data Preparation Procedure
- Required Information
- Safevue Startup Procedure
- Data Entry Procedure
- Glazing Data Entry Procedure
- Figure C-8. Process Chart: Glazing Data Entry Procedure
- Explosives Data Entry Procedure
- Figure C-10. Process Chart and Description: Explosives Data Entry Procedure
- Algorithm Data Entry Procedure
- Safevue Selection Analysis Procedure
- Data Preparation for Selection Analysis Procedure
- Figure C-13. Process Chart: Safevue Selection Analysis Procedure
- Figure C-14. Description: Safevue Selection Analysis Procedure
- Glazing Data Preparation for Selection Analysis Procedure
- Figure C-16. Process Chart: Glazing Data Preparation for Selection Analysis Procedure
- Table C-1. Minimum Thickness Table Selection for Thermally Tempered Glass
- Table C-2. Minimum Thickness Table Selection for Polycarbonate
- Table C-5. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 220-lb TNT
- Table C-8. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
- Table C-9. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
- Table C-11. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
- Table C-13. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident
- Table C-15. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 500-lb TNT
- Table C-17. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
- Table C-19. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
- Table C-20. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 23-kg TNT
- Table C-24. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
- Table C-25. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
- Table C-27. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
- Table C-32. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
- Table C-34. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 460-kg TNT
- Table C-35. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
- Table C-36. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
- Table C-37. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
- Table C-38. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 1000-lb (460-kg) TNT
- Table C-39. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
- Table C-40. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
- Table C-41. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
- Table C-42. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 1000-lb (460-kg) TNT
- Table C-43. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
- Table C-45. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
- Table C-48. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
- Plate Data Preparation Procedure
- Results Analysis Procedure
- Figure C-19. Process Chart and Description: Results Analysis Procedure
- Modifying a Cross-Section to Avoid Failure
- Modifying a Cross-Section to Avoid Overdesign
- Appendix D. Risk Analysis
- Planning Procedure
- Information Sensitivity
- Information Sensitivity -Cont.
- Section D-2. Assets
- Required Information
- Figure D-3. Process Chart: Assets Procedure
- Primary Asset Value Assessment Procedure
- Figure D-5. Process Chart and Description: Asset Identification Procedure
- Figure D-6. Process Chart: Primary Asset Value Assessment Procedure
- Figure D-7. Description: Primary Asset Value Assessment Procedure
- Criticality to the Military's Mission
- Asset Replaceability
- Relative Value for AA&E
- Relative Value for Controlled Medical Substances
- Relative Value for Other Assets
- Relative Value for People as Assets
- Secondary Asset Value Assessment Procedure
- Required Information
- Table D-13. Secondary Asset Value Rating
- Section D-3. Design Basis Threat
- Identification of Likely Aggressors Procedure
- Identify Likely Aggressor
- Figure D-11. Potential Aggressors Selection Table
- Likelihood of Aggression Procedure
- Figure D-12. Process Chart: Likelihood of Aggression
- Asset Profile
- Table D-15. Asset Usefulness to Aggressor Factor Applicability Table
- Usefulness for Assets with Direct Application to Aggressor's Goals
- Usefulness for Assets with Publicity Value
- Local Incidents in the Past
- Nearby Incidents in the Past
- Asset Accessibility
- Table D-21. Potential for Future Incidents
- Table D-22. Asset Accessibility Factor Applicability Table
- Table D-24. Accessibility of Unit Level Storage of AA&E
- Effectiveness of Law Enforcement
- Deterrence
- Likelihood Rating
- Required Information
- Applicability of Indicated Threat Severity Levels
- Figure D-14. Process Chart: Applicable Tactics and Severity Levels Identification Procedure
- Figure D-15. Description: Applicable Tactics and Severity Levels Identification Procedure
- Figure D-16. Potential Tactic Selection Table
- Tactics Consolidation Procedure
- Figure D-18. Process Chart and Description: Tactics Consolidation Procedure
- Table D-30. Threat Parameters
- Section D-4. Level of Protection
- Figure D-19. Process Chart: Level of Protection Procedure
- Collateral Damage Assessment Procedure
- Required Information
- Figure D-21. Process Chart: Collateral Damage Assessment Procedure
- Figure D-22. Description: Collateral Damage Assessment Procedure
- Table D-32. Asset Categories with Collateral Damage Potential
- Figure D-23. Process Chart: Collateral Damage Threat Severity Level
- Figure D-24. Description: Collateral Damage Threat Severity Level
- Appendix F Examples
- Facility Characteristics
- Table E-1. Description of Primary Assets
- Table E-2. Actions for Example Number 1
- Figure E-1. DCS Worksheet for Example Number 1
- Asset Value/Aggressor Likelihood Worksheet
- Asset Value/Aggressor Likelihood Worksheet -Cont.
- Asset Value/Aggressor Likelihood Worksheet -Cont.
- Asset Value/Aggressor Likelihood Worksheet -Cont.
- Asset Value/Aggressor Likelihood Worksheet -Cont.
- Example Number 2: Design Basis Threat Procedure
- High-Ranking Military Personnel
- Administration Staff
- Back Up Generator
- Table E-4. Actions for Example Number 2, Continued
- Table E-4. Actions for Example Number 2, Continued
- Glazing System Tactic and Threat Severity Level Worksheet
- Figure E-8. DCS Worksheet for Example Number 2
- Figure E-9. TTSL Worksheet for Office Equipment
- Figure E-9. TTSL Worksheet for Office Equipment
- Figure E-11. TTSL Worksheet for Administration Staff
- Figure E-12. TTSL Worksheet for Back Up Generator
- Example Number 3: Level of Protection
- Figure E-13. DCS Worksheet for Example Number 3
- Example Number 4: System Analysis
- Table E-6. Blast Design Properties and Results
- Table E-7. Cost Data
- Table E-8. Actions for Example Number 4
- Figure E-14. CSS Worksheet Before Revising Requirements
- Figure E-15. FS Worksheet Before Revising Requirements
- Figure E-16. WS Worksheet Before Revising Requirements
- Safevue Data Entry Worksheet
- Table E-9. Actions for Example Number 4, Continued
- Figure E-18. SA Worksheet for Laminated Glass
- Table E-10. Actions for Example Number 4, Continued
- Table E-11. Actions for Example Number 4, Continued
- Table E-12. Actions for Example Number 4, Continued
- Figure E-19. SA Worksheet for Laminated Polycarbonate
- Figure E-20 SA Worksheet for Glass-Clad Polycarbonate
- Figure E-21. SA Worksheet for Air-Gap with Polycarbonate
- Table E-13. Actions for Example Number 4, Continued
- Figure E-22.AS Worksheet Before Revising Requirements
- Table E-14. Actions for Example Number 4, Continued
- Figure E-23. CSS Worksheet After Revising Requirements
- Figure E-24. FS Worksheet After Revising Requirements
- Figure E-25. AS Worksheet After Revising Requirements
- Figure E-26. WS Worksheet After Revising Requirements
- Figure E-27. CSCF Worksheet for Glass-Clad Polycarbonate
- Table E-15. Actions for Example Number 4, Continued
- Figure E-28. FCF Worksheet
- Table E-16. Actions for Example Number 4, Continued
- Figure E-29. Installation Cost Worksheet
- Figure E-30. Initial Cost Worksheet
- Figure E-31. CSCF Worksheet for Laminated Polycarbonate
- Figure E-32. CSCF Worksheet for Air-Gap with Polycarbonate
- Appendix F- Cross Sections
- Air-Gap
- Figure F-2. 7/8-inch Air-Gap
- Figure F-5. 1-1/4-inch Air-Gap
- Figure F-7. 1-15/16-inch Air-Gap
- Extruded Ionomer
- Glass-Clad Polycarbonate
- Figure F-12. 11/16-inch Glass-Clad Polycarbonate
- Figure F-14. 15/16-inch Glass-Clad Polycarbonate
- Figure F-16. 1-3/16-inch Glass-Clad Polycarbonate
- Figure F-18. 1-3/16-inch Glass-Clad Polycarbonate
- Figure F-20. 1-5/16-inch Glass-Clad Polycarbonate
- Figure F-22. 1-3/8-inch Glass-Clad Polycarbonate
- Figure F-24. 1-5/8-inch Glass-Clad Polycarbonate
- Figure F-26. 2-1/16-inch Glass-Clad Polycarbonate
- Laminated Glass
- Figure F-29. 2-inch Laminated Glass
- Laminated Polycarbonate
- Figure F-31. 1-1/4-inch Laminated Polycarbonate
- Bibliography
- References
- References -Cont.
- References -Cont.
- Glossary
- Glossary -Cont.
- Glossary -Cont.
- Glossary -Cont.
- Glossary -Cont.
- Index
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Standardization Document Improvement Proposal
Evaluation and Selection Analysis of Security Glazing for Protection Against
Ballistic,Bomb, and Forced Tactics
|
|