Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MIL-HDBK-1021/1
TABLE 9
Helicopter Landing Lanes
(See Note 1)
_____________________________________________________________________________
Item
Criteria
_____________________________________________________________________________
Length
1600 feet to
Provide a number of equally
2000 feet.
spaced "touchdown" or holding
points with adequate separation,
usually not less than 400 feet
from center to center.  Multiple
lanes are to be spaced a minimum
of 200 feet from centerline to
centerline of lanes.
Width
75 feet.
Shoulders:
Shoulders adjacent
25 feet.
May be increased when
to all operational
necessary to accommodate dual
pavements
operations with fixed-wing
aircraft.
Longitudinal grade
Variable.
Conform to the longitudinal
grade of the abutting primary
pavement.
Transverse grade
5.0% first 10 feet followed by
2.0% minimum.
4.0% maximum.
____________________________________________________________________________
NOTE 1:
Criteria for landing lanes has been included to show the spacing
between multiple VFR touchdown points on a single runway and the
separation between parallel VFR runways.  The layout shown in Figure 21
is for a typical U.S. Army staging field and should not be used for
Navy or Marine Corps design without the prior approval of the Naval Air
Systems Command.
52








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business