Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MIL-HDBK-1023/4
Figure 18
MALSR Configuration
5.12
Standby Engine Generator Plants
5.12.1
Preventive Maintenance Inspection Procedures. To perform the PMIs contained in
Table 18, proceed as follows:
a) Weekly checks
(1) Before starting the engine, check the following:
(a) Battery water level.
(b) Immersion heater operating.
(c) Engine oil level.
(d) Governor oil level.
(e) Engine generator coolant level.
(f) Fuel level in main storage tank.
(g) Battery trickle-charge current.
71








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business