Section 5:
CHECKOUT DATA SUMMARY
5.1
Postconstruction Facility Checkout Data.  Table 5 contains the basic
test information obtained from each of the postconstruction facility
checkouts.  This includes primary inlet, secondary inlet, and total inlet air
mass flow rates for each aircraft and engine thrust setting, as well as the
corresponding enclosure interior velocity, "cell" depression and maximum
augmenter wall, and ramp surface temperatures.  The information is arranged
chronologically in the order in which the facilities were checked out.
17