- Guide for Architect Engineer Firms Performing Services for the Atlantic Division
- Record of Revisions
- Forward
- Forward -Cont.
- Forward -Cont.
- Index
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Section 1. Definitions and General Guidance
- Definitions
- Philosophy
- Selection of Materials
- Consultation Services
- Consultation Services -Cont.
- A & E Performance Awards
- A & E Performance Awards -Cont.
- Progress Payments
- Progress Payments -Cont.
- Instructions for Completing Contractor's Invoice
- Naval Facilities Engineering Command Contractor's Invoice
- Instruction for Completing Contract Performance Statement
- Contract Performance Statement
- Instructions for Completing Affidavit
- Affidavit
- Instructions for Completing Contractor's Release
- Contractor's Release Under Contract
- Section 2. Contractor Requirements
- Scope
- Conferences and Inspections
- Site Information
- Subsurface Conditions
- Occupational Safety and Health Standards
- Value Engineering
- Value Engineering -Cont.
- Shore Electronics Projects
- Constructions and Operating Permits
- Constructions and Operating Permits -Cont.
- Contract A & E Progress Report
- Section 3. Submittal Requirements
- PEP Submittal
- Exterior Architectural Design Submittal
- Exterior Architectural Design Submittal -Cont.
- 35% Station Presentation
- 35% Station Presentation -Cont.
- 35% Submittal
- 35% Submittal -Cont.
- 35% Submittal -Cont.
- 100% Submittal
- 100% Submittal -Cont.
- 100% Submittal -Cont.
- Final Submittal
- Final Submittal -Cont.
- Quality Control Data
- Quality Review Signature Block
- Host Nation Approval
- Italian Law Compliance
- Section 4. Basis of Design
- Architectural
- Structural
- Site Plan
- Asbestos,Lead Based Paint,and Toxic Waste
- Asbestos,Lead Based Paint,and Toxic Waste -Cont.
- Water Supply
- Airfield Pavement
- Dust and Erosion Control
- Cathodic Protection & Protective Coatings
- Cathodic Protection & Protective Coatings -Cont.
- Physical Security
- Mechanical Systems
- Heating,Ventilation and Cooling
- Heating,Ventilation and Cooling -Cont.
- Heating,Ventilation and Cooling -Cont.
- Energy/Solar Analysis
- Energy Conservation Methods
- Heating Plants and Heating Plant Additions
- Fuel Distribution and Storage
- Outside Design Temperature LANTNAVFACENGCOM Activities
- Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
- Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
- Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
- Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
- Guidelines for Using Building Design Energy Target
- Energy Analysis
- Solar Analysis
- Project Summary Data for Mechanical Systems
- Fire Protection Systems
- System Safety
- Electrical Systems
- Electrical Systems -Cont.
- Electronic Systems
- Electronic Systems -Cont.
- Electronic Systems -Cont.
- Table 4.8.2.1 EMCS Protections in LANTNAVFACENGCOM: Current Status
- Instrumentation and Control Systems
- Sizes of Drawings/Sketches
- Graphic Scales
- Lettering and Shading
- Title Blocks
- Material Symbols on Drawings
- Common Discrepancies in Nomenclature
- Metric Dimensioning
- Section 6. Specifications
- References
- Specifying New Materials
- Pre-Qualification Statements and Experience Requirements
- Phraseology
- Misuse of Words
- Use of Abbreviations and Symbols
- Submittal Procedures
- Sample Outline Specification
- Sample Outline Specification -Cont.
- Sample Outline Specification -Cont.
- Sample Outline Specification -Cont.
- 100% Submittal (Complete Specifications)
- Bid Items
- Federal and Military Specifications
- Section 7. Cost Estimates
- 35% Design
- 100% Design
- Estimates for Negotiated Construction Contracts
- Estimates for Projects Located Outside Conus
- Estimates for Protects Located in Iceland
- Section 8. Post Design Services
- Basis of Payment for Reimbursable Consultation
- Request for Consultation
- Consultation Reports
- Design Field Support
- Number of Site Visits
- A & E Tasks and Responsibilities for Design Field Support
- Shop Drawings/Submittal Review
- Stateside Contracts
- Submittal Flow Chart 1(without OMSI)
- Submittal Flow Chart 1-0(without OMSI)
- Submittal Flow Chart 2(without OMSI)
- Submittal Flow Chart 2-0(without OMSI)
- Overseas Contracts
- Overseas Contracts -Cont.
- Reservation of Review and Approval by the Government of Contractor Submittals
- Architectural
- Structural
- Structural -Cont.
- Structural -Cont.
- Mechanical
- Mechanical -Cont.
- Electrical
- Electrical -Cont.
- Government is Approving Authority
- Government is Approving Authority -Cont.
- Miscellaneous Submittal Review Aspects
- Interior Design (Option)
- Scope
- Development Sequence and Submittal Requirements
- Operation and Maintenance Support Information (OMSI)
- Operation and Maintenance Support Information (OMSI) -Cont.
- Operation and Maintenance Support Information (OMSI) -Cont.
- Cathodic Protection System Inspection,Testing and Acceptance (Option)
- Cathodic Protection System Inspection,Testing and Acceptance (Option) -Cont.
- Electrical Design Guide
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Figures
- Appendixes
- Drawing Format
- Required Calculations
- Riser Diagrams
- Fire Alarm Riser Diagram
- Multiple Conduct/Cable Runs
- Asbestos
- Scheduling and Sequencing Construction Contracts
- Government Furnished Equipment
- Breaker/Relay Settings
- Manholes and Handholes
- General Rules
- Pole Plates and Conductors
- Fuse Protection
- Techniques for Minimizing Voltage Drop
- Equipment Rating
- Emergency Lights,Exit Lights, and Fire Protection Systems
- Grounding Systems
- Cable Shields
- Regulators
- Capacitors
- Switch Gear
- Panel Board Schedules
- Switchboards and Switchgear
- General Guidelines
- Fixture Details
- HVAC Equipment
- Selection Guidance
- Motor Control Centers
- Automatic Standby Power Systems
- Figure 1. One-Line Diagram
- Figure 2. One -Line/Riser Diagram
- Figure 4. Underground or Single Grounded Primary System -without Surge Arresters
- Figure 6. Multi-Grounded Primary System (Delta-Wye)-without Surge Arresters
- Figure 8. Multi Grounded Primary System (WYE-WYE)-Without Surge Arresters
- Telecommunications Coordination and Responsibility Chart
- Panelboard MDP Schedule
- Figure 12. Lighting Fixture Schedule
- Figure 13. Electrical Plan of Above
- Figure 14. Electrical Plans of Above
- Figure 15. Electrical Plans of Above
- Appendix A Electrical Guide Legend-(Interior)
- Appendix A Electrical Guide Legend-(Interior) -Cont.
- Appendix A Electrical Guide Legend-(Interior) -Cont.
- IDS Symbols
- Abbreviations
- Abbreviations -Cont.
- Appendix B Electrical Guide Legend-(Exterior Underground)
- Appendix B Electrical Guide Legend-(Exterior Underground) -Cont.
- Abbreviations
- Appendix C Electrical Guide Legend-(Exterior- Overhead)
- Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
- Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
- Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
- Appendix D Electrical Guide Legend (One-Line Diagrams)
- Appendix D Electrical Guide Legend (One-Line Diagrams) -Cont.
- Typically Used ANSI Control Function Symbols
- Abbreviations
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
Guide for Architect Engineer Firms Performing Services for the Atlantic
Division
|
|