- Guide For Architect Engineer Firms Performing Services for the Marine Corps Air Station
- Record of Revisions
- Forward
- Forward -Cont.
- Forward -Cont.
- Forward -Cont.
- Index
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Section 1. Definitions and General Guidance
- Section 1. Definitions and General Guidance -Cont.
- Conflicts of Interest
- Selection of Materials
- Consultation Services
- Progress Payments
- Naval Facilities Engineering Command Contractor's Invoice
- Naval Facilities Engineering Command Contractor's Invoice -Cont.
- A & E Project Accounting Form
- A & E Project Accounting Form -Cont.
- Section 2. Contractor Requirements
- Scope
- Site Information
- Construction Schedule
- Security Clearances
- Camera Pass
- Sample Contract A & E Progress Report
- Section 3. Submittal Requirements
- 35% Submittal
- Pre-Final Submittal
- Pre-Final Submittal -Cont.
- Pre-Final Submittal -Cont.
- Final (100%) Signed Submittal
- Final (100%) Signed Submittal -Cont.
- Quality Control Review
- Section 4. Basis of Design
- Structural
- Site Plan
- Environmental Construction and Operating Permits
- Asbestos,Lead Based Paint,and Hazardous Materials
- Water Supply
- Airfield Pavement
- Dust and Erosion Control
- Cathodic Protection and Protective Coatings
- Railroads
- Physical Security
- Plumbing
- Heating,Ventilation, and Cooling
- Heating,Ventilation, and Cooling -Cont.
- Energy Conservation
- Energy Conservation Submittal Requirements
- Guidelines for Using Building Design Energy Target
- Energy Analysis
- Project Summary Data for Mechanical Systems
- Fuel Distribution and Storage
- Fire Protection Systems
- System Safety
- Electrical Systems
- Electronic Systems
- Electronic Systems -Cont.
- Electronic Systems -Cont.
- Instrumentation and Control Systems
- Instrumentation and Control Systems -Cont.
- Section 5. Drawings/Sketches
- CAD Drawing Preparation
- Drafting Media
- Scales
- Disk Labeling
- Common Discrepancies in Nomenclature
- Boring Log Presentation
- Graphic Scale
- Figure 5.14.1
- Section 6. Specifications
- Specifying New Materials
- Proprietary and Restrictive Requirements
- Phraseology
- Misuse of Words
- Use of Abbreviations and Symbols
- Submittal Procedures
- Sample Outline Specification
- Sample Outline Specification -Cont.
- Sample Outline Specification -Cont.
- Sample Outline Specification -Cont.
- Bid Items
- Federal and Military Specifications
- Section 7. Cost Estimates
- Pre-Final Design
- Final
- Section 8. Post Design Services
- Shop Drawings/Submittal Review
- Government is Approving Authority
- Miscellaneous Submittal Review Aspects
- Operation and Maintenance Support Information (OMSI) (Option)
- Operation and Maintenance Support Information (OMSI) (Option) -Cont.
- Cathodic Protection System Inspection, Testing and Acceptance (option)
- Cathodic Protection System Inspection, Testing and Acceptance (option) -Cont.
- Attachment A Cherry Point CAD Standards
- Cherry Point CAD Standards
- CAD Lineweights Setup
- "NatCadStndFULL.ctb"
- "NatCadStndFULL.ctb" -Cont.
- "NatCadStndFULL.ctb"
- Attachment B Cherry Point Mechanical Standards
- Steam Standards
- Steam Standards -Cont.
- Attachment C Cherry Point Civil Standards
- Storm Drainage
- Joints, Reinforcements, and Mooring Eyes
- Pavement Membrane Layers
- Civil Design Requirements
- Blank Page
- Blank Page
Guide For Architect Engineer Firms Performing Services for the Marine Corps
Air Station
|
|