PROJECT SUMMARY DATA FOR MECHANICAL SYSTEMS
1. Project Title and Location: ______________________________________________
2. Total Project Construction Cost $_____________________
3. Building Type:
Administration
____
New Structure
____
Applied Instruction
____
Renovation
____
Barracks
____
Addition
____
Industrial
____
Other (note)
____
Institutional
____
__________________
4. Buildin g Conditioned Floor Area __________ Sq. Ft. (A/C)
__________ Sq. Ft. (Heated) or __________ Sq. Ft. (Heated and A/C)
5. Air conditioning System Description - (DX Split System, Air Cooled Recip Chiller,
etc.)
_______________________________________________________________________
_______________________________________________________________________
a. Total Tons
_____
GPM/Ton (Chilled Water) ______
b. Total Sq. Ft./Ton _____
GPM/Ton (Cond. Water)  ______
6. Air Conditi oning System Description - Airside (Constant Volume, FPVAV, etc.)
______________________________________________________________________
a. Total CFM
______  Vent (O.A.) CFM/SF
______
b. (Vent (O.A.) CFM  ______  Vent (O.A.) CFM/Person ______
c. Total CFM/Sq. Ft.  ______
d. Total CFM/Ton
______
7. Heating System Description (District Steam, Oil Fired Boiler, etc.)
_______________________________________________________________________
a. Capacity MBH
______
b. BTUH/Sq. Ft.
______
8. Design Data
Summer OADB
________ Winter OADB
________ Lights
Summer OAWB
________
Winter IADB  ________ Watts/SF ________
Summer IADB
________
Wall "U" Value ________
Summer IARH
________
Glass "U" Value________
Roof "U" Value________
Form MS-1