- Required Documents for Architect -Engineer Contracts
- Required Documents for Architect -Engineer Contracts -Cont.
- Record of Revisions
- Foreword
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- List of Appendices
- General Information
- Definitions
- Definitions -Cont.
- Pre-Negotiation
- Engineering Services
- Post Construction Award Services
- A-E Design Performance Awards
- E-Liability
- Organizational Chart of OICC FE
- General Performance Requirements
- Correction of Deficiencies in Design
- Authorized Contracting Officers
- A-E Verification of Information Obtained
- Contact with Government Activities
- Survey Points
- Utilities
- Progress Payments
- Section 3. Design Submittals and Reviews
- Preliminary (35%) Submittal
- Final Submittal
- Form of Review
- Form of A-E Response to Review Comments
- Correction of Design Deficiencies
- Section 4.Post Construction Award Services
- A-E Action
- Consultation Services
- As-Built Drawings
- As-Built Drawings -Cont.
- Section 5. Basis of Design
- Design Computations
- Sanitary Sewer and Sewage Treatment Systems
- Dust and Erosion Control
- Floor Layout
- Mechanical
- Plumbing
- Restriction on the Use of Ozone Depleting Substances (ODS)
- Exterior Distribution Systems
- Environmental Considerations
- Fire Protection
- Fuel Storage and Distribution
- Electronic Systems
- Cathodic Protection
- Value Engineering
- Utilities
- Engine Generators
- Section 6. Soils Investigation,Field Survey,Color Renderings and Interior Design Services
- Report
- Geochemical Evaluation
- Surveys
- Color Renderings
- Mandatory Procurement Sources
- Section 7. Project Drawings
- Floor Plans and Elevations
- Architectural
- Structural
- Mechanical
- Complete horizontal and vertical survey control
- Graphic Scales
- Miscellaneous
- Drawing Revisions
- Index of Drawings
- Professional Registration Stamp
- Section 8. Project Contract Specifications
- Submittals
- Coordination of Specifications with the Drawings
- Unrestricted Bidding
- Qualified Products
- Performance Specifications
- Available Specifications
- Part and Subpart Numbering
- Priority of Specification References
- Parallel Sentence Structure
- Phraseology
- Indeterminate Words and Phrases
- Vocabulary
- Capitalization
- Preparation of Solicitation Amendments
- Section 9. Cost Estimates
- Preparation of Cost Estimates
- Project Cost Limitations
- Submittal Requirements
- Naval Construction Force (NCF) Projects
- Appendix A: A-E Contract Clauses
- Architect -Engineer Fixed Price Contract
- Federal Acquisition Regulation (FAR)
- DOD FAR Supplement (DFARS)
- Additional Clauses
- Architect -Engineer Fixed Priced Contract
- Covenant Against Contingent Fees
- Anti-KickBack Procedures
- Requirement for Certificate of Procurement Integrity-Modification
- Certificate of Procurement Integrity-Modification
- Price or Fee Adjustment for Illegal or Improper Activity
- Limitation on Payments to Influence Certain Federal Transactions
- Limitation on Payments to Influence Certain Federal Transactions -Cont.
- Limitation on Payments to Influence Certain Federal Transactions -Cont.
- Limitation on Payments to Influence Certain Federal Transactions -Cont.
- Disclosure
- Procurement Integrity -Service Contracting
- Security Requirements
- Suspension of Work
- Audit-Negotiation
- Cost or pricing data
- Price Reduction for Defective Cost or Pricing Data
- Price For Defective Cost or Pricing Data-Modificaions
- Price For Defective Cost or Pricing Data-Modificaions -Cont.
- Subcontractor Cost or Pricing Data
- Subcontractor Cost or Pricing Data-Modifications
- Termination of Defined Benefit Pension Plans
- Indefinite Quantity
- Equal Opportunity
- Equal Opportunity -Cont.
- Notification of Visa Denial
- Privacy Act Notification
- Privacy Act
- Balance of Payments Program
- Authorization and Consent
- Worker's Compensation Insurance (Defense Base Act)
- Taxes -Foreign Fixed-Price Contract
- Taxes -Foreign Fixed-Price Contract -Cont.
- Payments Under Fixed-Price Architect Engineer Contracts
- Interest
- Prompt Payment for Fixed-Price Architect Engineer Contracts
- Invoice Payments
- Invoice Payments -Cont.
- Contract Financing Payments
- Disputes (Dec 1991)-Alternate
- Protest After Award
- Design Within Funding Limitations
- Responsibility of the Architect -Engineer Contractor
- Bankruptcy
- Subcontractors and Outside Associates and Consultants
- Value Engineering-Architect- Engineer
- VEP preparation
- Government Supply Sources
- Contracting Officer's Representative
- Statutory Prohibitions on Compensation to Former Department of Defense Employees
- Prohibition on compensation
- Report concerning former DoD employees
- Liquidated damages
- Special Prohibition on Employment
- Prohibition Against Retaliatory Personnel Actions
- Disclosure of Information
- Pricing Adjustment
- Estimating system deficiencies
- Drug Free Work Force
- Government Rights
- Supplemental Cost Principles
- Option For Supervision and Inspection Services
- Postaward Conference
- Engineering Change Proposals
- Pricing of Contract Modifications
- Transportation of Supplies
- Transportation of Supplies -Cont.
- Organizational Conflicts of Interest
- Indefinite Quantity
- Delivery Order Procedures
- Option to Extend the Term of the Contract
- Limitations on Authority of A-E
- Drawings Prepared by an Architect- Engineer
- General Statement of Architect -Engineer Services
- Subtitutions of Key Personnel
- Designation of Engineer in Charge
- Appendix B: Post Construction Award Services (PCAS) Information
- Post Construction Award Services (PCAS) and Products
- Post Construction Award Services (PCAS) and Products -Cont.
- Policy
- Utilization of funds after Construction Contract Award
- Guidelines for Determining Types of Funds to be Utilized for Various Products
- Architect-Engineer (A-E) Post Construction Award Services
- Funds
- Development of Scone
- Critical Items Summary
- Construction Schedule
- Responsibilities of Parties Involved
- Unforeseen Consultation
- Consultation on Definitive Critical Items
- Reports/In-and-Out Briefs for Consultation Services
- Action
- Recommended PCAS Field Trips
- Critical Items Summary
- Electrical
- Request for A-E Action on Construction Problem
- PCAS Under Contract
- Record Of Consultation
- Appendix C: Gov-Forms
- Order for Supplies or Services
- Performance Evaluation
- Quality of A-E Services by Discipline
- Special Project Request
- Special Project Request -Cont.
- Military Construction Project Data
- Military Construction Project Data -Cont.
- Naval Facilities Engineering Command Contractors Invoice
- A-E Contract Performance Statement
- Contractor's Release
- Engineering and Design Criteria Review
- Review of Contractor's Submittals Request
- Cost Estimate
- Proposal /Estimate for Contract Modification
- Memorandum
- Architect -Engineer and Related Services Questionnaire
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect-Engineer and Related Services Questionnaire for Specific Project -Cont.
- Appendix D:A-E Liability Information
- OICC Far East Instruction
- Discussion
- Action
- A-E Responsibility Board
- A-E Responsibility Board -Cont.
- Responsibility of A-E Contractor
- Responsibility of A-E Contractor -Cont.
- Architect-Engineer (A-E) Liability Program
- Definitions
- A-E Liability Coordinator
- Procedures
- Report
- Architect-Engineer Financial Responsibility,Findings and Recommendation
- Architect-Engineer Financial Responsibility,Findings and Recommendation -Cont.
- A-E Liability Process
- A-E Liability Process -Cont.
- A-E Liability Process -Cont.
- A-E Liability Process -Cont.
- Target Timeframe for Processing A Potential A-E Liability Case
- A-E Liability Processing Timeframe
- A-E Liability Processing Status Log Format
- Designation of Case Numbers
- Appendix E: Current List of NAVFAC Design Manuals and Military Handbooks
- Listing of NAVFAC Design Manuals and Military Handbooks
- Listing of NAVFAC Design Manuals and Military Handbooks -Cont.
- Listing of NAVFAC Design Manuals and Military Handbooks -Cont.
- Listing of NAVFAC Design Manuals and Military Handbooks -Cont.
- Listing of NAVFAC Design Manuals and Military Handbooks -Cont.
- Listing of NAVFAC Design Manuals and Military Handbooks -Cont.
- Appendix F: Procedures for Entry to Military Installations
- Personal History Statement
- Application to Conduct Business Within Fleet Activities
- Personal History Statement
- Personal History Statement -Cont.
- Personal History Statement -Cont.
- Personal History Statement -Cont.
- General Information
- General Information -Cont.
- Personal Security Information
- Personal Security Information -Cont.
- Personal Security Information -Cont.
- Appendix G: Review Requirements and Redicheck Checklists
- Plans, Specifications and Cost Estimate Review Requirements
- Architectural
- Architectural -Cont.
- Architectural -Cont.
- Architectural -Cont.
- Architectural -Cont.
- Civil
- Civil -Cont.
- Civil -Cont.
- Civil -Cont.
- Structural
- Structural -Cont.
- Structural -Cont.
- Mechanical
- Mechanical -Cont.
- Mechanical -Cont.
- Mechanical -Cont.
- Electrical
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Fire Protection
- Fire Protection -Cont.
- Specifications
- Specifications -Cont.
- Cost Engineering
- Appendix H: Construction Criteria Base (CCB) Information
- Constructon Criteria Base
- Constructon Criteria Base (CCB)
- SPECSINTACT (SI)
- CCB SPECSINTACT System Hardware
- Software Requirements
- Order Form
- Basic CCB Subscription
- Engineering and Design Criteria at Your Personal Computer
- Engineering and Design Criteria at Your Personal Computer -Cont.
- NIBS Construction Criteria Base (CCB)
- National Institute of Building Sciences
- Required computer System
- System Menu
- Translate and Copy Files
- CCB Installation
- Order Form NIBS Construction Criteria Base
- The Newsletter For Users of The Construction Criteria Base
- System Requirements
- Optional Databases Disc
- CD -ROM Resource
- Introduction to NIBS
- SPECSINTACT Special
- SPECSINTACT Special -Cont.
- The Newsletter for CCB Users
- Appendix I: Roofing Design Criteria
- Roofing Design Criteria
- New NAVFAC Roofing Design Criteria
- New NAVFAC Roofing Design Criteria -Cont.
- Attachment (1)
- Scupper Through Roof Edge
- Attachment (2)
- Attachment (3)
- Attachment (4)
- Attachment (5)
- Vented Wall Flashing Detail
- Attachment (7)
- Vent Stack Detail
- Light Metal Roof Edge
- Heavy Metal ROof Edge
- Attachment (11)
- Attachment (12)
- Attachment (13)
- Attachment (14)
- Flashing Structural Member Through Roof Deck
- Attachment (16)
- Appendix J: Fire Protection Design Guidance
- Fire Protection Design Analysis
- Fire Protection Design Analysis
- Fire Protection Design Analysis Checklist
- Fire and Smoke Partitions,Fire Walls
- Extinguishing Systems
- Water Supply
- Water Supply -Cont.
- Branch Policies
- Section 1. Alarm and Detection Systems
- Duct Smoke Detectors
- Wiring
- Submittals
- Section 2. Sprinkler Systems
- Sprinkler Riser
- Pressure Relief Valves
- Section 3. Carbon Dioxide Systems
- Reserve Supply of C02
- Sealing of the Area
- Section 4. Dry and Wet Chemical Extinguishing Systems
- Section 5. Fire Pumps
- Drains in Fire Pump Rooms
- Section 6. Foam Extinguishing Systems
- Section 7. Miscellaneous
- Hazardous Material Storage
- Manual Fire Alarm Evacuation Systems
- Control
- Power Supply
- Alerting Devices
- Automatic Fire Alarm Systems
- Drawings and Data Required of the Contractor
- Pre-action and Deluge Sprinkler Systems
- Specific Requirements
- Heat Responsive Detectors
- Automatic Wet-Pipe Sprinkler Systems
- Materials
- Excess Pressure Pumps
- Automatic Dry-Pipe Sprinkler Systems
- Materials
- Interruption of Service
- Water Supply for Fire Protection
- Air Conditioning Systems
- Significant FIRS Protection Features for Inclusion in Specifications
- Interior Finishing Materials and Insulation
- Applicability of Fire Protection Criteria
- Carpet
- Use of Plastics
- Roof Surfacing and Assemblies
- Fire Prevention During Construction
- Requirements
- Family Housing Smoke Detectors
- Fire Protection in Elevator Hoistways
- PACNAVFACENGCOM Fire Protection Engineering Branch Policies
- Applicability
- Section 1. Alarm and Detection Systems
- Duct Smoke Detectors
- Wiring
- Audible Alarm Devices
- Section 2. Sprinkler Systems
- Sprinkler Riser
- Pressure Relief Valves
- Section 3. Carbon Dioxide and Halon Systems
- Reserve Supply of Halon and CO
- System Piping
- Section 4. Dry and Wet Chemical Extinguishing Systems
- Section 5. Fire Pumps
- Fire Pump Houses
- Section 6. Foam Extinguishing Systems
- Section 7. Miscellaneous
- Memorandum
- Smoke Detectors
- Sprinkler System Trim, Valves and Drain
- Guidance Letter on Acceptance of Japanese Manufactured Item for Fire Protection System
- Fire Protection System Equipment and Material Guidance
- Action
- Unclassified
- Fire Protection for Facilities Engineering,Design,and Construction
- Abstract
- Foreword
- Fire Protection Criteria Manuals
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Section 1: Introduction
- Absence of Criteria
- Design Analyses
- Fire Protection During Construction
- Smoke-Developed Rating
- Section 2: Building Construction
- Limiting Interior Fire Spread
- Means of Egress Marking
- Interior Finish
- Flame Spread
- Roof Coverings and Roof Deck Assemblies
- Fire Department Vehicle Access
- Plastic Pipe and Conduit
- Section 3: Common Hazards
- Pulverizing Equipment
- Location of Outdoor Oil-Insulated Transformers
- Table 3.2.3.2 Fire Protection for Outdoor Oil-Insulated Transformers
- Less Flammable, Liquid-Filled Transformers
- Collection, Baling, and Storage Rooms
- Section 4: Special Occupancies and Hazards
- Storage Areas, Shops, and Laundry Areas
- Dining and Food Preparation Facilities
- Building Height Limitations
- Locking Devices
- Child Development Centers (CDCs)
- Electronic Equipment Installations
- Sprinkler Protection
- Water Demands for Exposed Powder and Propellant Facilities
- Sprinkler Protection
- Column Protection
- Flammable/Hazardous (Flam/Haz) Storage
- Hazardous Materials Storage Areas
- Prefabricated Structures
- Flammable and Combustible Liquids
- Combustible Liquids Under Pressure
- Overhead Foam-Water Sprinkler System Requirements
- Manual Release Stations
- Equipment Locations
- Out-of-Airframe Acoustical Enclosures (Test Cells)
- Fixed Liquid Oxygen Tanks
- Overhaul and Repair Shops
- Windowless Structures
- Section 5: Water Supply for Fire Protection
- Table 5.1.2 Water Demands for Sprinklered Facilities
- High Demands
- Water Supply Pressure Requirements
- Table 5.2.2.3.9 Atmospheric POL Tank Cooling Water
- Table 5.2.2.3.b Pressurized POL Tank Cooling Water
- Reduction in Storage Capacity
- Pump Drive
- Installation Requirements
- Pressure-Regulating Valves (PRVs)
- Section 6: Fire Extinguishing Systems
- Design Requirements
- Connections to Exterior Fire Reporting Systems
- Portable Fire Extinguishers
- Wet Chemical Extinguishing Systems
- Section 7: Fire Alarm Systems
- Automatic Fire Detection Systems
- Addressable Interior Fire Alarm Systems
- Appendix A Uniform Building CODE and NFPA 220 Equivalents
- Appendix B Common Classification of Occupancies for DOD
- Appendix B Common Classification of Occupancies for DOD -Cont.
- Appendix C Occupancy Hazard Classification for Determining Automatic Sprinkler Densities
- Ordinary Hazard Group 2 Occupancies
- Special Occupancies
- Appendix D Procedure for Determining Fire Flow Demand for Unsprinkled Facilities
- Separation Distances
- Fire Fighting Access
- Table D1 Water Demands for Unsprinklered Facilities
- Examples Calculations
- Examples Calculations -Cont.
- References
- References -Cont.
- References -Cont.
- References -Cont.
- References -Cont.
- Index
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- Index -Cont.
- New Fire Sprinkler and Hard Wired Detectors Requirements for Government Housing
- New Fire Sprinkler and Hard Wired Detectors Requirements for Government Housing -Cont.
- Appendix K: Value Engineering
- Value Engineering
- Introduction
- Summary of VE Ideas
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Summary of VE Ideas -Cont.
- Civil
- Civil -Cont.
- Civil -Cont.
- Civil -Cont.
- Civil -Cont.
- Civil -Cont.
- Structural
- Structural -Cont.
- Structural -Cont.
- Structural -Cont.
- Structural -Cont.
- Structural -Cont.
- Structural -Cont.
- Mechanical
- Mechanical -Cont.
- Mechanical -Cont.
- Mechanical -Cont.
- Mechanical -Cont.
- Mechanical -Cont.
- Mechanical -Cont.
- Electrical
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Electrical -Cont.
- Appendix L: Sample Boring Log
- Boring Log
- Boring Log -Cont.
- Appendix M: Collateral Equipment Information
- Collateral Equipment Initial Outfitting Program for Go- of Japan (GOJ) Constructed Facilities
- Responsibilities and Actions
- Responsibilities and Actions -Cont.
- Responsibilities and Actions -Cont.
- GOJ Collateral Equipment Budget List
- Investment Items
- Final Facilities Improvement Program
- Final
- List of Furnished Equipment
- List of Furnished Equipment -Cont.
- List of Furnished Equipment -Cont.
- List of Furnished Equipment -Cont.
- List of Furnished Equipment -Cont.
- List of Furnished Equipment -Cont.
- List of Furnished Equipment -Cont.
- Final
- GOJ Collateral Equipment Summarized Buy List
- GOJ Collateral Equipment Summarized Buy List -Cont.
- Administration Building
- Furniture/Equipment Placement Sheet
- Furniture/Equipment Placement Sheet -Cont.
- Example of Interior Design Brochure
- Appendix N: Standard Drawing Sheet
- Drawing Sheet Size
- Drawing Sheet Size -Cont.
- Upper Value for D-Size Drawing
- Appendix 0: Example Graphic Scales
- Figure 1 Graphic Scales-Architectural Type
- Figure 2 Graphic Scales-Engineering Type
- Figure 3 Metric Graphic Scales
- Appendix P: Preparation of Specifications
- Instructions Format and Paragraphs
- Table of Contents
- Section 1: Introduction
- Proprietary Specifications
- Unrestricted Bidding
- Warranty Clauses in an NFGS
- Reviews
- Section 2 Procurement of Reference Documents
- How to Order Specifications and Standards
- Subscription Service (Automatic Distribution)
- DODISS/Special Inquiry Desk
- Diskettes
- General Services Administration Offices
- General Services Administration Offices
- Section 3: Elements of Specification Composition
- Cross-Reference to Drawings
- Excessive Paragraphing
- Objectionable Phrases
- Provide, Furnish, and Install
- Simplification
- Avoid Use of the Following
- Avoid Use of the Following -Cont.
- Avoid Use of the Following -Cont.
- Miscellaneous
- Factory Testing
- Coordination With Mechanical or Electrical Trades
- Section 4: Format and Typing of Specifications
- Exceptions to Three-Part Format
- Related Work
- Job Mock-up
- Pre-Installation Conference
- Source Quality Control
- Short Tables
- Tabulation of Information Under Levels
- Short Tables
- Page Numbering
- Delivery and Storage
- Products
- Execution
- Section 5: Outline Specifications
- General Description
- General Requirements
- PACNAVFACENGCOM policy
- Earthwork
- Cast in Place Concrete
- Structural Steel
- Roof Scuttle
- Stainless Steel Counters
- Section 6 Contract Specifications
- Pre-Qualification of Bidders or Contractors
- Standard Specification (SS)
- Special Requirements
- Specifying Options
- Use of " C o n t r a c t i n g Officer
- Bidding Information
- Section 7 Quality Control
- Approval Responsibility
- Approval Responsibility -Cont.
- Approval Responsibility -Cont.
- Section 8 Preparation of Solicitation Amendment
- Timeliness
- Section 9 Preparation of Change Order or Change Order Request
- Section 9 Preparation of Change Order or Change Order Request -Cont.
- Section 9 Preparation of Change Order or Change Order Request -Cont.
- Contents
- Contents -Cont.
- Contents -Cont.
- Contents -Cont.
- Technical Review Submittal List
- Technical Review Submittal List -Cont.
- Technical Review Submittal List -Cont.
- Appendix Q: Currency Exchange Rate Information
- Yen/Dollar Currency Exchange Rates
- Yen/Dollar Currency Exchange Rates-Cont.
- Funding Documents
- Military Interdepartmental Purchase Request
- Standard Operating Procedures (SOPS) for the Administration
- Procedures (Other than for Reimbursable Work)
- Procedures (Reimbursable Work)
- OICC Far East
- Request Obligation Authority
- Request Obligation Authority -Cont.
- Appendix R: IBOP Procedures
- International Balance of Payments
- International Balance of Payments (IBOP) Procedures
- International Balance of Payments (IBOP) Procedures -Cont.
- International Balance of Payments (IBOP) Procedures -Cont.
- Planned Procedure for IBOP Analysis
- Planned Procedure for IBOP Analysis -Cont.
- Procurement of CONUS Materials
- Procurement of CONUS Materials -Cont.
- Procurement of CONUS Materials -Cont.
- IBOP Analysis Procedure
- IBOP Analysis Procedure -Cont.
- IBOP Analysis Procedure -Cont.
- Cost Estimate
- Cost Estimate -Cont.
- Government Estimate
- Customs Free Import or Export of Cargo
- Customs Free Import or Export of Cargo -Cont.
- OICC Far East
- OICC Far East -Cont.
- OICC Far East -Cont.
- Planned Procedure for IBOP Analysis
- Planned Procedure for IBOP Analysis -Cont.
- Procurement of CONUS Materials
- Currency Adjustment Factor
- Currency Adjustment Factor -Cont.
- IBOP Analysis Procedure
- IBOP Analysis Procedure -Cont.
- IBOP Analysis Procedure -Cont.
- Cost Estimate
- Cost Estimate -Cont.
- Government Estimate
- Customs Free Import or Export of Cargo
- Customs Free Import or Export of Cargo -Cont.
- Distribution
- Distribution
- Distribution
- Distribution
- Blank Page
- Distribution
Required Documents for Architect -Engineer Contracts
|
|