specifications; sketches; and other corrected submittal documents; etc., as necessary to remedy
the deficiency(ies). If requested, the A-E shall also prepare and submit a letter identifying the
deficiency that was corrected and the impact on project cost, quality of construction, etc., as
related to the project.
During construction of the project, when construction contractor questions arise due to the poor
quality of the drawings or specifications, the A-E shall provide consultation services, without
additional compensation. Examples of poor quality include insufficient number of details,
illegible printing or line work, grammatical errors, incorrect or conflicting dimensions, incorrect
material specification, etc., resulting in contractor confusion regarding the the true intent of the
project or project design.