Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


c. Previous revision symbols and circles on all tracings shall remain. All revision data
shall remain in the revision space.
d. Indicate equipment model numbers, capacities, ratings, etc.
When the necessary changes have been made on the drawings, the note "as-built condition
shown" shall be placed in the revision block. In the case where no corrections on a drawing are
necessary, the words "as-built" shall be placed in the revision block. The Contracting Officer
or his authorized representative will sign and date the Record Drawings in the revision block.
4-5








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business