35%
100%
17.
Length of all columns agree with those
shown in column schedule................
18.
All sections are properly labeled.......
19.
All expansion joint locations agree with
architectural drawing....................
20.
All structural dimensions have been
checked  . . . . . . . . . . . . . . . . . . . . .
21.
Adequate geotechnical investigation and
tests were performed....................
22.
Standard title block format is shown....
23.
Drawing, contract and work request
numbers, when applicable, are shown.....
24.
Location map, scale(s), abbreviations
and legend with symbol explanations are
shown . . ..I..............................
25.
All drawing notes and wording are
checked for proper spelling and english
usage...................................
Locations of all existing walls,
26.
windows, doors, equipment, systems, etc.
shown have been field checked and
verified correct . . . . . . . . . . . . . . . . . . . . . . . .
27.
Design provides for easy access and
maintenance . . . . . . . . . . . . . . . . . . .
28.
All elements of design shown have been
coordinated with other disciplines
participating in this design package...
29.
Materials and equipment shown are either
readily obtainable , or, long lead items
are clearly indicated together with lead
time requirements . . . . . . . . . . . . . . . . . . . . . . .
30.
Construction materials specified are most
economical to satisfy project requirements.
2








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business