have been completed and all necessary corrections made, the Contracting
Officer shall be advised so as to permit final inspectlou and
acceptance. The installation foreman or other competent representative
of the contractor shall be present during final inspection. The
contractor shall submit a signed and dated certificate to the
Contracting Officer as stipulated in NFPA Standard No. 13, Section on
Acceptance Tests. Final testing shall be witnessed by the
PACNAVFACENGCOM Fire Protection Engineer who will recommend the
system for acceptance or nonacceptance to the Contracting Officer.
IV-3