PACNAVFACENGCOMINST 11010.12A
1 MAR 1989
1 A p r i l , 1988
FINAL
C l a s s i f i e d Responsibility of GOJ/USG for Furnishing/
Installation of Equipment, Etc. for FIP Projects
1 . Equipment furnished by FIP projects will be limited to
t h o s e whose installation are authorized by prevailing DOD
C o n s t r u c t i o n Criteria Manual and pertinent Japanese laws and
r e g u l a t i o n s .  T h e list of furnished equipment (attachment 1) will
be utilized for classified responsibility of COJ/USG for furnishing/
i n s t a l l a t i o n Of equipment, etc. for FIP projects.
2 . The responsibility of GOJ and USC for furnishing and installation
o f equipment, etc. f u r n i s h e d b y F I P p r o j e c t s w i l l g e n e r a l l y b e
classified as follows:
a. Equipment, etc. to be furnished and installed by the GOJ:
( 1 ) Built-in furniture and installed equipment such as shelves,
k i t c h e n equipment, r e e f e r and freezer rooms.
(2) Equipment, etc. t h a t a r e e s s e n t i a l t o t h e p r o p e r u s e o f
a p p l i c a b l e f a c i l i t y a n d f i x e d . , s u c h as crane, equipment for
g a s s t a t i o n , and telephone switchboard,
b. Equipment, etc. t o be furnished and installed by the USC:
M o v a b l e properties and fixtures (such as lockers and machine
tools).
c . Equipment, etc. to be furnished by the USG and installed by
the GOJ;
(1) Equipment, etc. t h a t a r e r e q u i r e d t o b e i n c l u d e d a s p a r t
of the project, such as fixtures requiring drainage, disposers,
and equipment, etc. n o t available in Japan.
( 2 ) Other items that it is considered more appropriate for
the GOJ to install in relation to the interior finish, such as
c a r p e t and wall paper.
3. Equipment, etc. t o be installed by the GOJ as indicated in paras
2 a and 2c, above, m u s t be fixed permanently. However, those equip-
m e n t , etc. i n d i c a t e d i n p a r a 2 c , a b o v e , w i l l b e f u r n i s h e d b y t h e
USC at s u c h a time as specified in a construction schedule prepared
b y the local DFAB and be the same as described in the specifications
c o o r d i n a t e d at the stage of development of construction drawings.
I f not received by the GOJ at a required time, equipment will be
i n s t a l l e d by the USC.
4 . Equipment not l i s t e d i n t h e a t t a c h e d l i s t w i l l b e c o o r d i n a t e d
between GOJ and USC on a case by case basis.
5. Definition of portable and fixed equipment will be based on
t h e attachment 2.