SECTION 7
QUALITY CONTROL
1. QUALITY CONTROL FOR CONSTRUCTION CONTRACTS, ADMINISTRATION AND
RESPONSIBILITY:
1 . 1 The contract clause titled "Inspection of Construction (FAR
5 2 . 2 4 6 - 1 2 Apr 84)" states, in part: 'The Contractor shall maintain
an adequate inspection system and perform such inspections as will
ensure that the work called for by this contract conforms to
c o n t r a c t requirements."
1 . 3 Quality Control is the responsibility of the Contractor for
the 'Contractor Quality Control system (CQC)," Section 01400 and
"Contractor Inspection System (CIS)," Section 01401. It's a system
o f planning activities that the Contractor must perform to properly
prepare before beginning a phase of work to ensure that the
accomplished work is in accordance with the contract.
1 . 3 Quality Assurance means the various functions, including
inspection, performed by the government to determine whether a
c o n t r a c t o r has fulfilled the contract Obligations pertaining to
quality and quantity.
SYSTEMS
CQC/CI
COMPARISON
OF
CI SYSTEM (NFGS-01401)
CQC SYSTFM (NFGS-01400)
LEVELS OF APPLICATION:
Less than $2,000,000 (Est. Const. Co:
$2,000,000 or more
If CQC desired. approval required
( E s t . Const. Cost)
from PACNAVFACENGCOM Code 05 for spec
w a i v e r with appropriate justification
SPECIFICATIONS CONSIDERATIONS:
Div. 1.
Same as CQC
Submittals are approved
Div. 1:
by the government.
Submittals approved by
Submittals approved by the
Div 2-16:
government
the Contractor unless
S p e c i f i e d otherwise.
Note: Ensure items
requiring government
a p p r o v a l are identified
i n specifications
(Submittal Status Log
forms).