INTERNATIONAL BALANCE OF PAYMENTS (IBOP) PROCEDURES
c.
" T h e following bulk construction materials:
s a n d , gravel
a n d other soil materials, stone, c o n c r e t e masonry units and fired
brick".
d.
"Ready mixed asphalt and portland cement concrete"
p r o v i d e d that foreign cost is estimated not to exceed $10,000.
3. U.S. Army Corps of Engineers , Japan District (Camp Zama)
p r o v i d e s for the following additional exceptions which we will
also use:
a.
A g g r e g a t e s (sand, s t o n e ; e t c . ) - p a r t l y c o v e r e d i n p a r . 2
b. P o r t l a n d C e m e n t
c . Concrete Products (blocks, piles, poles, etc.)-partly
covered in par. 2
d. Petroleum Products (asphalt, lubricating oil, e t c ) p a r t l y
covered in par. 2
e . A c o u s t i c a l Units (including acoustical suspended ceiling
system)
f. Asphalt Roofing Felt
g . G a l v a n i z e d Iron Sheet (including precoated galvanized
steel sheet; flat, corrugated and ribbed, prefabricated materials
t h o s e are mainly consisted of galvanized steel/iron sheet --
e x a m p l e ; ducts for HVAC and roof ventilators/louvers for natural
ventilation)
h. G l a s s , Clear, (including wired glass and framed
g l a s s d o o r s / g l a z e d aluminum sashes)
i . Gypsum wall Board
j.
I n s u l a t i o n Board: mineral wool
k. I n s u l a t i o n : glasswool
l . Plywood
m. S t r u c t u r a l Steel Shapes
n. T i l e : ceramic (including mosaic)
o . T i l e : v i n y l asbestos
p. E l e c t r i c a l C o n d u i t , r i g i d steel including communication
conduit, a n d c o n d u i t f i t t i n g s
q . Conduit (for electrical distribution-underground), and
C o n d u i t Fittings
r . Sheet Metal Outlet Boxes
s . Reinforcing Steel
t . Steel Plates
4. R e f e r e n c e s ( a ) a n d ( b ) a d d i t i o n a l l y a l l o w f o r o t h e r e x c e p t i o n s
such as " u n r e a s o n a b l e cost".
This exception would apply where the
analysis requires domestic end products but urgency demands use of
t h e "unreasonable cost" foreign end product.
5 . W e must be critical of our analysis to justify our choice of
m a t e r i a l procurement.
I B O P will be prepared for each project
above $25,000.
E s t i m a t e s for MCON's, Step II's and locally funded
2
|
||