MEMORANDUM
From:
(Engineering)
(Contracts)
To:
Subj: GOVERNMENT ESTIMATE (GE)
Encl: ( 1 ) G E d t d
l . The government estimate attached is forwarded,
CONTRACT NUMBER N62836-__ -C- ___
TITLE
2.
IBOP ANALYSIS
ITEM/COST
NORMAL
PLANNED
DIFFERENCE
( L o c a l material)
(U.S. material)
CWE
(A)
FEC
(B)
(A)/(B) =
(A)/(B) EQUAL TO OR LESS THAN 0.5 USE PLANNED PROCEDURE
(A)/(B) GREATERTHAN 0.5 USE NORMAL PROCEDURE
PROCEDURE WILL BE USED FOR THE PROCUREMENT
3.
, (Yes or No) U.S.
materials
have
been
specified
f o r some specialized requirements.
APPROVED SIGNATURE
DATE
E n c l o s u r e (6)