Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MEMORANDUM
From:
(Engineering)
(Contracts)
To:
Subj:
GOVERNMENT ESTIMATE (GE)
Encl:
(1) GE dtd
1.
The government estimate attached is forwarded.
CONTRACT NUMBER N62836- __ -C-___
TITLE
IBOP ANALYSIS
2.
DIFFERENCE
ITEM/COST
PLANNED
NORMAL
( L o c a l material)
(U.S. material)
(A)
CWE
FEC
(B)
(  A ) / (B ) =
(A)/(B) EQUAL TO OR LESS THAN 0.5 USE PLANNED PROCEDURE
(A)/(B) GREATER THAN 0.5 USE NORMAL PROCEDURE
PROCEDURE WILL BE USED FOR THE PROCUREMENT
, (Yes or No)  U.S. materials have been specified
3.
for some specialized requirements.
APPROVED SIGNATURE
DATE
Enclosure (6)








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business