4)
Licensing, notification or permitting requirements
exist.
5)
Removal and disposal methods are limited by
regulation.
This information shall be included in the sampling and analysis
report (see below) and used to properly edit NFGS-02090 or NFGS-
02071.
The A/E shall prepare a report which details and summarizes the
results of the lead containing paint or lead contamination
investigation and sampling program. The report shall list the areas,
types and extent of lead containing paint or lead contamination,
summarize the requirements of applicable federal, state and local
regulations and describe the procedures to be incorporated in the
construction contract documents for removal and disposal of lead
containing paint materials or lead contamination.
15.9 Environmental Permit Requirements Investigation, Report, Permit
Applications and Consolidated Compliance Assessment Report
The A/E shall identify and design the project to comply with all
applicable Federal, State, Local and Intergovernmental Environmental
Protection Standards governing air quality, water quality, solid
waste and hazardous waste. The A/E shall design the facility to
comply with the most stringent applicable standards.
The project may require that the government secure permits for
pollution control, construction, operation, real estate acquisition,
land easements, etc. In such cases, the A/E shall investigate the
need for, report on, develop required data/design information (see
NORTHNAVFACENGCOMINST 5090.5A, enclosure (1), "Design Information
Needed to Prepare Environmental Permits") and obtain, complete and
submit permit applications to NORTHDIV. Draft and final permit
applications (including supporting documentation) and reports shall
be submitted to NORTHDIV in accordance with the Milestone and
Distribution Schedules of the Appendix "A". NORTHDIV shall be
responsible for submitting the application(s) for final permit(s).
All A/E contact with federal, state and local regulatory bodies shall
be coordinated through NORTHDIV.
The A/E shall prepare a Permit Requirements Report which includes the
following information and data:
a) Enclosure (2), "Project Review Environmental Permit
Checklist", to NORTHNAVFACENGCOMINST 5090.5A (see below).
b)
Permitting authority (EPA, COE, state, local, etc.).
c) Type of permit required (construction, operation, discharge,
use, dump, dredge, fill, haul, etc.).
d)
Who is responsible for submitting the permit application.
e)
Procedure and time necessary to complete the permit
15 -
10
|
||