Code 112/6870u
11/01/88/EJK
Sheet 2 of 5
UTILITY DATA SHEET
A/E Name
Proj ./Planning No:
Activity:
Gas
steam
CF(000) Annual
Consumption
Flow
lbs/hr Max.
CF(000)/HR Max
Demand
Flow (Daily)
lbs/hr (AUE)
In. W.C./psig
Pressure
Flow (Annually)
lbs/yr
Point of Connection
Point of Connection
Water
Sewage (Sanitary)
Gallons Annual
Flow(Max)
Consumption
Gal/Day
GPD Max.
Demand
Flow(Ave)
Gal/Day
GPM Max.
Flow (domestic)
Pressure (static)
psig
GPM Max.
Flow (fire)
Pressure (residual)
psig
Point of connection
Point of Connection
Telephones
Fire Alarm Sys
Yes No
a. Questions should be directed
Securing Sys
Yes No
to the Design Manager or Code
Utility Mgmt Sys
Yes No
404 Northern Division
Attachment 15A
2 of 5