18.4.3.2
Submit the following:
Supplement the basis of design discussions as necessary and revise
the calculations, if required, to reflect resolution of previous
government review comments.  Calculations shall be 90% complete.
18.4.4
Final Submission
18.4.4.1  Drawings:  Submit 100% complete drawings for all portions
of the structural design as listed above, revised, if required, to
reflect resolution of previous government review comments.
18.4.4.2  Specifications:  Submit 100% complete technical
specifications, properly edited, to reflect structural design
requirements.  (See the chapter titled "Preparation of
Specifications" for format for specifications).  General guidance on
specifications is as follows:
a)  Naval Facilities Engineering Command Guide Specifications
(NFGSs) are all inclusive and must be properly edited to delete items
which do not pertain to the project.  Unique items not covered in the
NFGSs must be added.  In the absence of a suitable NFGS, the A/E
shall provide an appropriate non-proprietary technical section
properly edited for the project.
b)  Names of items used in the specifications must be identical
with the names used on the drawings.
c)
Proprietary items may not be named.
d)  Give the construction contractor as many choices of material
as possible consistent with design requirements.  Define sizes on
drawings and materials in the specifications.
e)  Review referenced publications to confirm that the type,
size, and class designations used in the NFGS are the same as are
used in the applicable reference publications, especially referenced
publications which have been updated since the NFGSs were issued.
f)  Assure that earthwork specifications include recommendations
contained in the soils report.
g)  Select ASTM compaction testing method and give frequency of
testing.
h)  For projects involving rock excavation, include quantities
to be used as a Basis for Bid in the contract documents using
Attachment 5 of the chapter titled "Civil Design".
18.4.4.3
Submit the following:
Supplement the basis of design discussions as necessary and revise
the calculations, if required, to reflect resolution of previous
government review comments, if any.  At this stage, the design
analysis shall be 100% complete.
18 -
7