Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


2)
Calculations for industrial exhaust ventilation.
21.3.3
Progress Submission
21.3.3.1  Drawings:  Submit drawings illustrating facilities protection items
to the level of completion indicated in the individual technical design
discipline chapters contained herein.
21.3.3.2
Design Analysis:
Submit the following:
Supplement the basis of design discussions as necessary and revise the
calculations, if required, to reflect resolution of previous government review
comments.  Calculations shall be 100% complete.  Basis of Design level of
completion shall reflect that of the drawings.
21.3.4
Final Submission
21.3.4.1  Drawings and Specifications:  Submit 100% complete drawings and
specifications illustrating and describing facilities protection items as
detailed in the appropriate technical design discipline chapters contained
herein.
21.3.4.2
Design Analysis:
Submit the following:
Supplement the basis of design discussions as necessary and revise the
calculations, if required, to reflect resolution of previous government review
comments, if any.  At this stage, the design analysis shall be 100% complete.
21.3.5
Submission of Bidding Documents
Submit complete and corrected drawings, specifications and design analysis as
detailed above.
21 -
4








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business