4. ESTABLISHMENT AND APPROVAL OF VE TEAM VE services shall be
performed by a second team Of designers, separate and completely
independent from the original designers which prepare the 35%
plans and specifications. The VE services shall be directed by a
qualified firm or persons having Certified Value Specialist (CVS)
credentials  that  qualify  them  to  perform  such  services.
5. LEVEL OF EFFORT.
Typically Design A/E Effort:
PM
ARCH
STRUCT
ME
EE
CE
------------------------------------
2
4
4
4
4
8
Coordinate/discuss project
8
8
0
8
8
8
Review/comment
Resolution of Proposals -- part of 35% Review Board
Meeting--
Submit  Final  Report
8
-----------------------------
12
12
12
12
12
24
84 hours total
6 . P- - -J-E-C T -D A- - - - - - -B E - F U- - -I- -H E D .
RO
- - - - TA TO  - - - - RN S -
Prior to commencing a VE study,  the design A/E will forward
the following information to the VE Team.
(1)
Two sets of 35% drawings (full site)
(2)
Specifications - 2 copies
(3)
Detailed  Cost  Estimates  -  4  copies
(4)
Design  Analysis  (Basis  of  design;  calculations)  -  4
copies
(5)
Economic Analysis of Design Alternatives Report
Boring logs and soil reports
(6)
*  (7)
Computer  Energy/System  Analysis  and  Energy  Conservation
Report
*If required by Appendix "A"
7.
CERTIFIED  VALUE  SPECIALISTS  (CVS)  RESPONSIBILITIES.
--------------------------------------------------
Pre Study
a.
(1)
Review complete design package and identify high
cost areas.
Prepare  cost  model  (actual  vs.  historical).
(2)
Prepare bar graphs of all sub systems.
(3)
Prepare preliminary cost worth ratios.
(4)
40 Hour Study
b.
(1)
Team leader avid coordinator
(2)
Team recorder
2
Attachment 22A
2 of 5








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business