Custom Search
|
|
|
|||||
|
|||||
SECTION 1
INTRODUCTION
1. PURPOSE: The purpose of this publication,
requirements for contract deliverables.
Questions concerning the requirements of this
referred to as the "A/E Guide", is to inform
publication should be addressed to the
Architect/Engineer (A/E) firms of the
SOUTHNAVFACENGCOM Project Manager
administrative and technical requirements for
(PM).
providing professional services to Southern
Division, Naval Facilities Engineering Command
2. CONTRACT CLAUSES: The A/E should
(SOUTHNAVFACENGCOM). The A/E Guide
is part of the A/E firm's contract. It is essential
review the standard "Architect-Engineer
that the A/E Guide be thoroughly reviewed prior
Contract Clauses".
These clauses are
to submission of an A/E fee proposal and that it
incorporated, by reference, as part of the A/E
be referred to throughout the execution of the
firm's
contract
with
SOUTHNAV-
A/E contract. Special emphasis should be placed
FACENGCOM. Upon request, the Contracting
on Section 5 which discusses scope and cost
Officer will provide copies of the applicable A/E
limitations and Section 11 which provides
Contract Clauses.
INTRODUCTION
1-1
|
|||||