Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


project that results in an approved schematic
12. MCNR: Identifies those projects which are
design. PE documentation is used as the basis of
funded from Military Construction Navy Reserve
a request to Congress for authorization to
appropriations.
construct  a  facility  under  the  Military
Construction Program.
13. MCAF: Identifies those projects which are
funded from Military Construction Air Force
20. PROJECT MANAGER (PM): The PM
appropriations.
may be the COTR or assigned by the COTR to
serve on his/her behalf as the technical focal
14. NONAPPROPRIATED FUNDS (NAF):
point for a particular delivery order/project. The
NAF projects are those projects required to meet
PM shall be contacted directly for information
the morale, welfare and recreational program
and advice.
needs of the Navy, but are not funded through
the MCON or O&MN programs.
21. PLANNING AND DESIGN MANAGER
(PDM):
The
representative
of
15. NAVAL FACILITIES ENGINEERING
COMMAND (NAVFACENGCOM):  The
SOUTHNAVFACENGCOM who coordinates
with the Activity and the sponsor (usually a
design  and  construction  agency  for  the
Command of the Navy Department), and who
Department of the Navy, the Marine Corps and
will provide liaison in matters pertaining to scope
certain other Government agencies.
and funding of the project.
16. OFFICER IN CHARGE OF CON-
STRUCTION (OICC): In the administration
22. PUBLIC WORKS OFFICER (PWO):
of construction contracts, the Commanding
The PWO is the design/engineering agent of the
Officer, Southern Division, Naval Facilities
Activity.  In many cases, the ROICC at a
Engineering Command acts as the Officer in
particular  Activity  has  the  additional
Charge of Construction.
responsibility as PWO for that Activity.
17. O&MN:
A short-name appropriation
23. RESIDENT OFFICER IN CHARGE
designation for projects funded from the
OF  CONSTRUCTION  (ROICC)  OR
Operations
and
Maintenance
Navy
RESIDENT ENGINEER IN CHARGE OF
appropriation.
CONSTRUCTION (REICC): The Com-
manding Officer SOUTHNAVFACENGCOM
18. OPERATING AND MAINTENANCE
(OIC) usually delegates the field administration,
SUPPORT  INFORMATION  (OMSI):
surveillance/inspection of a construction contract
Documentation and procedures necessary to
to a Resident Officer in Charge of Construction
promote and maximize the efficiency, economy,
or to a Resident Engineer in Charge of
safety and effectiveness of the life cycle
Construction. In this case, A/E correspondence
operation and maintenance of a facility.
during the construction phase of the work shall
19. PROJECT
ENGINEERING
(PE)
be directed to the ROICC or REICC, with
PHASE: The preliminary design phase of a
DEFINITIONS AND ABBREVIATIONS
3-2








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business