P-141, Change 3
April 1997
PART N: ON-SITE SCHEMATIC
1. The A/E shall conduct an on-site project
approach and will continue until the team
reaches consensus on a schematic design.
schematic conference with the customer to
Elements of the schematic conference include:
develop an approved schematic design. The
project analysis documentation, which all
a. validated project analysis documentation
team members must have a thorough
(program requirements and square
understanding of, is the basis of
the
footage)
Schematic on-site. The preparatory work for
b. synthesized
this conference will include resolution of any
ideas,
options,
and
outstanding issues, graphical clarifications of
alternatives
c. preliminary selection of construction
any concepts, and any other work necessary to
be completely ready to produce a schematic
materials and systems
d. preliminary layout of built-in equipment
design. The A/E shall prepare, in advance of
the conference: the conference agenda,
and systems furniture
e. economic analysis
refinements and clarifications to any project
f. preliminary parametric cost estimate
analysis information including gaming
g. responsive schematic design drawings,
diagrams, preliminary costing, and preliminary
alternative drawings as necessary to serve as a
renderings, and models
h. total design consensus
starting point for the on-site.
2. The total project team attends the on-site
3. The A/E shall prepare minutes of the
schematic conference. The conference is a
conference.
working session utilizing the total team
DELIVERABLES
11-21