b) Provide alternative designs for rigid
6)
Storm drainage structure details
and flexible pavements where options
including security barriers
7)
are permissible and economically
Slopes and inverts of all pipes and
feasible.
profiles where necessary
c) Provide sectional details and/or
8)
Inverts and top elevations of all
schedules to show each type of
structures
9)
pavement structure.
Frames, grates and covers details
d) For new flexible pavements, identify
10)
Class or gauge of pipe
11)
wearing course, binder course, tack
Clearing and grubbing limits
12)
coat, prime coat, base course, subbase
Grassing limits
13)
course, and subgrade.
Benchmark information
e) For new rigid pavements, identify PCC
e. Utility Plans and Detail Drawings:
paving reinforcement where required,
1) Overall layout of systems, showing line
base course, and subgrade.
f) For flexible overlay construction,
sizes
2) New and existing systems shown
identify wearing course, binder course,
3) Valve and fire hydrant locations
leveling course, tack coats, seal coats,
4) Sizes of all components of systems
surface treatments, existing pavement
preparation, geotextile interlayers, and
indicated
5) Building services coordinated with
other details as appropriate.
g) For rigid overlay construction, identify
building plumbing drawings
6) Separation of water and sewer lines
PC concrete, bond breaking interlays,
7) Backflow preventers
requirements,
existing
8) Manhole spacing and details (including
pavement preparation, and other
details as appropriate.
top and invert elevations)
h) Bid information such as quantity of
9) Cleanout location
cracks in pavement to be sealed.
10) Pipeline profiles (gravity sewers
i) Graphic scale and north arrow
normally, plus force main when required
j) Applicable notes
by
State Permitting Agency)
k) All sections and details necessary for
11) Manhole, frames and cover details
12) Pump station location and details
construction
13) Air release valves location and details
2) Construction Sequence: Provide plans,
14) Locations coordinated with existing and
details and schedules of phasing and
other utilities
sequencing of new work. For projects
having complex phasing requirements,
f. Soil Boring Logs - See 35% Submittal.
consider the use of CPM or other network
system to graphically portray Interface and
g. For Airfield Pavement and other large
Phasing Requirements. Identify items of
paving projects include the following
work and constraints of each phase. Show
drawings:
temporary roads, detour routes, temporary
marking, and special traffic control
1) Paving Plan and Details
requirements. Coordinate all work with the
a) Identify each type of pavement
CIVIL SUBMITTAL REQUIREMENTS