SECTION 13
ARCHITECTURAL SUBMITTAL REQUIREMENTS
1. DESIGN GUIDANCE: Prior to beginning
anticipated building life and degree of
combustibility.
work, read SODIV-TG-1001, "Technical
Guidance for Architectural Design", for specific
d.Building Insulation: Describe types of
technical requirements.
insulation to be provided with specific R-
2. SUBMITTAL REQUIREMENTS: The
values for roof(s), walls, floor(s), etc.
following requirements shall be met at each
e. Construction Materials and Finishes:
submittal.
Describe materials for all major items of
2.1
SCHEMATIC SUBMITTAL:
construction including interior/exterior finishes.
The exterior finishes shall be submitted as
2.1.1 Basis Of Design: The basis of design
described in Section 11, Part D, "Color
must include the following information:
f. Discussion of Physical (barriers) and
a. Introduction:
Briefly describe the
Electronic Security requirements including
purpose of this project and extent of
listed criteria defining those requirements.
construction. Include and refer to supporting
Address design features proposed for use in
Appendices at the end of the Basis of Design
the construction.
which should include DD Form 1391 and
design conference minutes.
For USAF
g. Construction Contract Furniture,
projects, include AF Form 1158 - Facility
Furnishings and Equipment List: List the
Summary.
furniture and furnishings integral to the
b.Architectural Compatibility:
facility that will be included in the
Briefly
construction contract such as systems
describe architectural style of buildings in the
furniture, fixed seating and all other SID
immediate vicinity of the site and other
elements (bulletin boards, marker boards,
installation/base buildings having functions
lockers etc.).
similar to the facility being designed. Discuss
the approach to achieving architectural
h. Life-cycle Cost Comparison: Include data
compatibility with nearby facilities (both
for selection of (a) exterior wall systems, (b)
existing and future construction). Identify
interior wall/partition systems, (c) roof system
design changes made in response to previous
including membrane and
Architectural Review Board (ARB) comments.
c. Type of Construction: Describe type of
construction chosen with reference to
ARCHITECTURAL SUBMITTAL REQUIREMENTS
13-1
|
||