h.Interior Finish, Color, and Signage
HDBK-1006/1  Reference  Symbol
Schedules -- see para. 2.4.1.f. 4) and 5).
guidance.
d)
Wall and partition thickness, secure
area partition type, partitions that
i.  35% Generic Furniture Footprint
extend to overhead structure, fire and
drawn to the facility design scale is
acoustical rated partitions (show
necessary to ensure that each space has been
rating). Reference symbols for each
sized and configured appropriately. It shall
related section/detail.
include the SID systems furniture as well as
e)
Water coolers, janitor sinks, floor
the CID furniture. The CID furniture should
drains, fire extinguisher cabinets,
be clearly distinguished by lighter screening
access ladders and hatches, "walk-off"
or by graphic difference. This footprint is
mats in exterior entrances, public
general in scope and is developed to aid in
phones, signage directories, and built-
the facility design space allocations and
in shelving and equipment.
arrangements. This generic footprint may or
f)
Wall  and  floor  expansion/crack
may not be used in the development of either
control joints.
the SID or CID Furniture and Furnishings
g)
Boundaries of floor finish material
Designs.
changes and floor level transitions.
h)
Ramps, steps, and stairs.
2.3  INTERIM SUBMITTAL:
i)
Interim
Gross SF Area Tabulation Table and
submittals will sometimes be required by the
Diagram (locate near title block for
each floor plan sheet and show note
Statement of Work (SOW), which will indicate
"NOT  TO  BE  USED  FOR
the required completion percentage (e.g. 60%
BIDDING PURPOSES").
interim submittal). Specific submittal items will
j)
Necessary notes and schedules (use
be identified in the SOW, however, the primary
Key Notes for labels where practical).
components will normally be the drawings and
k)
Key Plans when an entire floor is not
specifications.
Drawings shall include all
shown on a single sheet.  Exterior
requirements of the 35% submittal plus
Elevation reference symbols may be
additional detail to bring them to the specified
shown on Key Plan.
completion percentage.
2) Reflected Ceiling Plans at same scale
2.4
100% SUBMITTAL:
as floor plans showing:
a) All ceiling types (identified by note or
2.4.1
Drawings:
legend) and acoustical ceiling tile
grid(s).
a. Architectural Plans:
b) Junctions of different ceiling finishes
1) Floor Plans showing:
and ceiling level changes.
a) Complete dimensions.
b) Spaces labeled with doors and
windows numbered and door swings
indicated.
c) Enlarged plans/elevations/sections and
details cross referenced per MIL-
ARCHITECTURAL SUBMITTAL REQUIREMENTS
13-5








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business