Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


8) Lighting Fixture Details
2.4.2  100% Updated Basis of Design:
Provide revised or corrected Basis of Design or
state if not changed.
2.4.3  100% Calculations: Provide required
calculations per SODIV-TG-1004.
2.4.4  Response to Previous 35% Review
Comments:  A/E must always clarify major
comments
with
a
phone
call
to
SOUTHNAVFACENGCOM reviewer, rather
than wait until next submittal to respond.
2.5  FINAL SUBMITTAL:
The Final
Submission shall incorporate the corrections and
clarifications noted on the previous 100%
submittal.
ELECTRICAL SUBMITTAL REQUIREMENTS
17-4








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business