Custom Search
|
|
|
||
P-141, Change 4
November 1998
SECTION 8 - CRITERIA:
project. The A/E should contact the PM
for this information.
Add the following:
SECTION 9 - DESIGN CONSIDER-
ATIONS:
AIR FORCE CRITERIA: The project
Replace Paragraph 7.3, "Distribution of
design shall conform to the following Air
Submittals", with the following:
Force criteria:
DISTRIBUTION OF SUBMITTALS:
a. AFI 32-1024, Standard Facility
The A/E shall make submission directly to all
Requirements
b. AFM 88-29, Engineering Weather
concerned and shall use overnight mailing for
distribution of design submissions to review
Data
c. AFI
agencies. The A/E forwarding letter is to
32-1051,
Roof
Systems
include the following statement: "Review
Management
d. AFP 88-40, Sign Standards
comments should be forwarded through the
e. Air Force Interior Design Presentation
appropriate chain of command to the
Commanding Officer, Southern Division,
Format Manual
f. Activity requirements (as applicable)
Naval Facilities Engineering Command,
2155 Eagle Drive, P.O. Box 190010, North
Charleston, SC 29419-9010 (Attn: Code 07[
Project design shall also conform with other
]). If there are no comments, then a letter
criteria referenced in the above, such as
so stating should be forwarded." Copies of
related Air Force publications, OSHA
these for-warding letters are to be provided
Regulations, etc., and with other relevant Air
to the PM.
Force design criteria (AFIs, AFRs, ETLs,
AFPs and AFPMs, AFMs and AFJMANs,
SECTION 10 - REQUIREMENTS AND
AFHs and AFJHs, MIL-HDBKs, etc.).
OPTIONS:
These and other types of Air Force criteria
are available on the CCB discs or from
Add the following:
various Air Force internet websites, such
as the homepages for the Air Force
REQUIREMENTS AND MANAGE-
Directorate of Departmental Publishing @
MENT PLAN (RAMP): The RAMP
http://afpubs.hq.af.mil, Air Force Civil
provides project planning information such
Engineer Support Agency (afcee) @
as base architectural guidelines; base
http://www.afcesa.af.mil/default.html, and
standards and regulations for fire
Air Force Center for Environmental
protection,
safety,
security,
Excellence
(afcee)
@
communications, systems operability and
http://www.afcee.brooks.af.mil/afceefrm.h
maintainability, energy conservation, and
tm. The Air Force Major Command
other base/site specific requirements; a Base
and/or local activity will advise the
Southdiv Project Manager (PM) regarding
which, if any, Air Force criteria are
applicable to the design of a particular
P-141, Change 3
AIR FORCE REQUIREMENTS
18-2
|
||