Custom Search
|
|
|
||
SITE INVESTIGATION/USER DIS-
g. An action list of required follow-on
CUSSIONS: The A/E shall visit the site to
items that must be pursued in order to
gather all necessary site information, review
produce a complete project definition
User operations and discuss User needs.
package.
SITE INVESTIGATION/CHARRETTE:
OPERABILITY
AND
MAINTAINABILITY REPORT: The
The A/E shall visit the site and gather all
necessary site information, review User
A/E shall prepare an Operability and
operations, and discuss User needs. In
Maintainability Report using Engineering
addition, the A/E shall conduct a Charrette
Technical Letter (ETL) 88-4, "Reliability and
(intensive problem solving effort, including
Maintainability Design Checklist", dated 24
user interviews, completed in a specified time
June 1989, as a guide. The report shall
period) to determine and document all
specifically
address
operability
and
criteria and requirements. The A/E shall
maintainability in the following areas:
prepare a schematic floor plan showing all
1) architectural elements and site work
rooms and space requirements during the
2) electrical and mechanical system
Charrette and shall brief this floor plan to the
AF
Design
Manager
and
selections
3) roofing system selection
SOUTHNAVFACENGCOM
prior
to
4) water and wastewater systems
completing the Charrette.
5) corrosion prevention and control
SITE
INVESTIGATION/DETAILED
DATA: The A/E shall visit the site and
COMMANDER/SENIOR
LEVEL
BRIEFING: The A/E shall develop as part
gather all necessary site information, review
User operations, and discuss User needs. In
of the Final PD submittal, professionally
addition, the A/E shall prepare the following
prepared presentation boards depicting
data:
design development in layman's non-
technical terms and descriptions.
The
a. A written statement of the project
briefing will provide a discussion of the Final
goals.
PD and parametric cost estimate documents.
b. A comprehensive graphic analysis of
The briefing is considered an important part
the project site, the surrounding
of ensuring user involvement, obtaining high
context and climatic information.
level approval,
c. An analysis of existing facilities which
are directly impacted by the
construction of a facility or the
deployment of a system.
descriptive and statistical data
regarding the proposed user group(s)
that addresses function, activities, and
major equipment to be accommodated.
e. Concepts/idea
diagrams
for
implementing the goals and objectives
of the project.
f. Summary statements of the unique
aspects of the project design problem.
AIR FORCE REQUIREMENTS
18-4
|
||