Custom Search
|
|
|
||
DESIGN
5. Action.
a. Design. Design all new projects using the guidance noted above.
b. Planning. When appropriate, use base master plans to promote the economy of the
cantilever system. Otherwise, allow either conventional hangar roof-framing system to best
support the Quality of Life goals of the Navy.
c. Criteria. Include changes from enclosure (1) in next update of reference (a).
6. Coordination. This guidance has been coordinated within NAVFAC and with NAVAIR,
COMLANTFLT, and COMPACFLT. Address comments and questions on the use of this guidance to
the POC.
7. Point of Contact. For clarification or additional information related to this subject, please contact
Mr. Vincent Donnally, P. E., DSN 262-4204, Com. (757) 322-4204, Fax (757) 322-4416 or e-mail
.
R. D. CURFMAN
By direction
Distribution:
COMNAVFACENGCOM (CHENG, Dr. Wright/BDD Mr. Robinson)
LANTNAVFACENGCOM (CI/Bolton, McDowell, Wang)
PACNAVFACENGCOM (DGM-DPM/Torngren)
SOUTHNAVFACENGCOM (CI00/Stehmeyer)
SOUTHWESTNAVFACENGCOM (03CN/Phillips)
ENGFLDACT CHESAPEAKE (CIBL)
ENGFLDACT MEDITERRANEAN (CIBL)
ENGFLDACT MIDWEST (CIBL)
ENGFLDACT NORTHEAST (CIBL)
ENGFLDACT NORTHWEST (CIBL)
ENGFLDACT WEST (CIBL)
USACOE (CECW-ETE/Joe Hartman, Pete Rossbach)
USAF CESA (ENM/Jim Caulder)
CMC (Code LFF-1/Jane Brattain)
Copy to:
COMLANTFLT (N46)
COMPACFLT (N46)
COMNAVAIR (Code 08Y1,Mr. Wolfe)
2
|
||