22
21
Building:
001
Replace one 500 KVA, 7,200/480 Volt
LS C
X
electrical transformer in
Substation 4.
002
LS
C
X
Replace non-energy efficient
window.
003
Rehabilitate hydraulic press pit.
LS
C
X
X
R&lace ceiling in Metallurgical
LS
C
004
Lab.
005
Replace oil filled circuit breaker LS C
X
in Substation 1.
006
Remove asbestos, in air conditioning LS C
X
room. (Environmental compliance)
X
LS
C
007
Replace creosote-block floor.
LS
C
X
008
Replace office lighting fixtures.
009
Reduce cromic acid mist and other
LS
C
X
emissions in material cleaning,
coating and plating area.
X
Replace flooring material that
010
LS
c
contains asbestos.
Repair major blisters and east/west
LS
C
X
011
expansion joints. Recoat main roof
with fibrated aluminum coating.
012
Install fire wall in manufacturing
LS C
X
area from north to south walls.
LS
C
X
013
Consolidate office area air
conditioning systems into one
energy efficient system.
014
Insulate attics over office areas.
LS
C
X
Rehabilitate steam heating delivery LS C
X
015
system to provide additional steam
Figure 7-6
Example of Completed Form
Summary-2
7-15
|
||