BASIC DEFINITIONS
FACILITY CONDITION REPORT DETAILED DEFICIENCY LISTING (EXHIBIT 1)
DATE
WHEN THE INSPECTION WAS CONDUCTED
INSPECTION TIME
ACTUAL TIME USED TO CONDUCT THE INSPECTION
AND PREPARE THE REPORT
FACILITY NUMBER
THE FACILITY NUMBER ASSIGNED TO THE FACILITY
TYPE INSPECTION
CATEGORY OF INSPECTION STRUCTURAL,
ELECTRICAL, MECHANICAL, OTHER
INSPECTOR
NAME OF THE PERSON CONDUCTING THE
INSPECTION
PKG
PACKAGE IDENTIFIER (USE A, B, C, D, ETC:)
E
CHECK THIS BLOCK IF AN EMERGENCY/SERVICE
CALL WAS SUBMITTED TO CORRECT THE
DEFICIENCY (E/S CALL NUMBER SHOULD BE
ANNOTATED IN THE DESCRIPTION BLOCK FOR
INSPECTOR TRACKING)
1 THRU 5
THE YEAR CORRECTION OF THE DEFICIENCY IS
REQUIRED BY.
DEFICIENCY
DESCRIPTION
DETAILED DESCRIPTION OF THE DEFICIENCY FOUND
W/C
CRAFT OR WORK CENTER THAT SHOULD CORRECT
THE DEFICIENCY. A "C" SHOULD BE USED WHEN
CONTRACT ACCOMPLISHMENT IS RECOMMENDED
LAB HRS
THE ESTIMATED LABOR HOURS TO CORRECT THE
DEFICIENCY, LEAVE BLANK IF W/C BLOCK IS "C"
LAB COST
THE LABOR COST IS THE ACTIVITY RATE X LABOR
HOURS, LEAVE BLANK IF W/C BLOCK IS "C"
MATL COST
MATERIAL COST, LEAVE BLANK IF W/C BLOCK IS "C"
TOTAL COST
ENTER ESTIMATED TOTAL CONTRACT ESTIMATE.
Appendix E-3