Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


LONG RANGE MAINTENANCE PLANNING (LRMP)
TIME TABLE
(EXAMPLE)
Times are for inspection only. After inspection times are selected, add the following labor hours per facility.
Electrical
Mechanical
Structural/Rooting
1.5 hrs
LRMP Data Collect
2.0 hrs
1.2 hrs
1.3 hrs
Analysis
1.2 hrs
2.2 hrs
1.9 hrs/est
Cost Estimate
1.9 hrs/est
1.9 hrs/est
Travel (based on travel zone in which the facility is located)
It must be noted, the Inspection times determined are average times and may differ due to differences in
the way facilities are arranged and the variety of uses within each facility.
In determining the total square feet of a facility, look at all category codes when determining the inspection
time. Additional time should be added if security clearances are required and/or escorts required.
How much time will be required to accomplish a complete LRMP inspection with
Example:
cost estimates in Category 61XXX? The facility is a single story facility located in
Travel Zone 5 and the sum of all Category Code Square footage is 25,000 SF.
Facility has built-up roof. No abnormal conditions or facility layout problems exist.
Electrical
Rooting
Structural
Mechanical
27.9
27.4
1. From Tables
5.5
22.1
1.2
1.5
2. LRMP Data
2.0
2.0
Collection
1.2
1.3
3. Analysis
2.2
2.2
1.9
1.9
4. Cost Estimate Prep
1.9
1.9
5. Travel
4.0
4.0
1.0
3.0
a. Trips*
.55
.55
.55
.55
b. Time/Trip
1.65
.55
c. Travel Tie
2.2
2.2
34.4
34.3
12.15
Total LRMP
29.85
or 110.7 Hours
(1+2+3+4+5c)
*Inspection Time divided by 8 hrs/day.
(l-4+5c)
Exhibit-2
Appendix G-10








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business