STRUCTURAL
5.2.28 Window: Check for:
n
Fit:
n
Seal:
n
Air infiltration:
n
Rust:
n
Rot:
n
Water intrusion:
n
Insect damage:
n
Glazing condition:
n
Broken/cracked panes:
n
Missing panes:
n
Sash:
Fit
Seal
n Lock condition:
n Screen condition:
5.3 REPAIR/REPLACEMENT CRITERIA:
5.3.1 Asbestos: Asbestos in good condition will be maintained in place until it
must be repaired, replaced with a non-asbestos material, or removed prior to renova-
tions and demolitions in accordance with OPNAVINST 510023C. Asbestos abatement
projects should be prepared in accordance with OPNAVINST 11010.20 (Series).
Abatement actions should be taken to minimize or eliminate the hazardous exposure to
asbestos. These actions include:
n  Operation and Maintenance (O&M) Program:
n  Encapsulation or enclosure:
n Removal:
5.3.2 Ceiling: Renewal of ceiling finishes is cyclic maintenance. Each situation
must be assessed by the inspector before preparing an estimate.
5.3.3 Construction: If in doubt about repairing or replacing the construction of
a facility have an engineering study performed to review the situation. For wood, load
bearing members use the following, criteria for repair:
n  Good overall condition: