Piping Systems (see paragraph 2.6).
(2)
(a) Radiography.
ANSI/ASME B31.1, Power Piping.
(b) T, UT, PT and MT.
ANSI/ASME B31.1, Power Piping.
o
Test and Inspection Procedures.
4.7.3
Commands shall
develop test and inspection procedures for critical tests conducted
on hyperbaric facilities.
These procedures shall comply with
applicable code requirements and contain the following as a
minimum:
Procedure title and reference number.
b.
Test/Inspection description and scope.
references (e.g., codes, standards,
C.
Applicable
specifications, drawings, etc.).
d.
Safety precautions.
e.
System pre-test line-up procedures.
f.
Test and Inspection procedures in sufficient detail to
allow proper performance and safe conduct.
h.
System post-test shut-down procedures.
i.
Signature verification for inspectors and test director.
4.7.4
Test and Inspection Records. Records of tests and
inspections
conducted on the hyperbaric facility
shall be
maintained on file by the hyperbaric facility manager. Test and
inspection records shall be retained until superseded by subsequent
re-testing or until p e r m a n e n t removal of the
system/equipment/component(s) involved.
4.8 FACILITY WORE MANAGEMENT QUALITY CONTROL
4.8.1
General. The proper control and management of work
performed on manned hyperbaric facilities is necessary to ensure
continued material adequacy of the installed systems, equipments
and components. Facility work management quality control consists
of the following areas:
Re-Entry Control Procedures and Records.
b.
Tag-Out Procedures.
Maintenance System and Procedures.
d.
e.
In-House Quality Control Inspections and Documentation
Audits.
4.8.2
Re-Entry Control (REC) Procedures and Records. REC
is a system for maintaining positive control of work performed
within the certification boundaries of the facility. The REC
system provides for monitoring and documenting the following: