Concurrent Technologies Corporation
Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 5
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
B.
Air Sparge Pump System
1.
Design Goals:
2.
Design Parameters
a.
Air Flow Rate:
165185 cfm
b.
Operating Pressure:
c.
Operating Temperature:
d.
Steam Inclusion:
e.
Other:
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
C.
Vacuum Extraction Wells
1.
Design Goals:
Horiz. well chosen because it would provide more surface
area to
treat the linear contamination.
2.
Design Parameters
a.
Pipe Type:
b.
Pipe Diameter:
c.
Depth: 75 ft
d.
Screen Interval:
e.
Screen Type:
f.
Number and Spacing:
1 horizontal, 205 ft long
g.
Other:
|
||